Project #AB2          Bid Date: 9/28/2023 @ Varies

Summit Pacific Hospital Expansion, Elma, WA

Documents:
Bid Set Plans
Bid Set Plans - Topographic Survey
Bid Set Plans - Food Service
Bid Set Specs
Geotechnical Report
Existing As-Built Plans 6/6/2011
Addendum #1
Addendum #2
Addendum #2 Plans
Addendum #3
Addendum #3 Plans
Addendum #3 RFI's
Addendum #4
Addendum #4 RFI #14 Plans
Addendum #4.1
Addendum #5

Bid Packages:
Bid Package #2.00 - Demolition
Bid Package #3.00 - Structural / Site Concrete & Drilled Piers
Bid Package #5.00 - Structural Steel Supply
Bid Package #5.10 - Structural Steel & Decking Erection
Bid Package #6.10 - Finish Carpentry & Casework
Bid Package #7.20 - Roofing Complete
Bid Package #7.30 - Weather Resistive Air Barrier & Siding Complete
Bid Package #8.00 - Doors Frames & Hardware
Bid Package #8.40 - Glazing & Aluminum Metal Glazed Systems
Bid Package #8.50 - ICU Auto Entrances & Specialty Function Doors
Bid Package #9.00 - GWB & Metal Stud Framing
Bid Package #9.30 - Acoustical Ceilings & Panels
Bid Package #14.00 - Elevator
Bid Package #21.00 - Fire Suppression
Bid Package #31.00 - Earthwork & Utilities
Bid Package Supplement Documents
Bid Package Supplement Documents - Zone & Site Logistics Plans

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Contractor:
Absher Construction
1001 Shaw Road E
Puyallup, WA 98372
253-845-9544
Fax: 253-841-0925

Contact: Keara Flynn
206-200-5294
Keara.Flynn@Absherco.com

Description:
A phased project consisting of the expansion of the existing Summit Pacific Medical Center in Elma, WA and subsequent remodel of the current Emergency Department.