Central Kitchen Renovation Phase II - Kitchen Equipment Contractor/Construction Manager (KEC/CM), Seattle, WA - Exhibit A - Contract Documents    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 427 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Exhibit A - Contract Documents
Page 2 Section 000101 Owner and Design Team Information
Page 4 Section 000110 Table of Contents
Page 6 Section 004122 Instructions to Bidders
Page 8 Section 004123 Bid Form
Page 11 Section 004123a Specified General Conditions Breakdown
Page 12 Section 004123b Specified General Conditions Staffing Breakdown
Page 13 Section 004313 Bid Bond
Page 14 AIA Document A133-2019 Standard Form of Agreement Between Owner and Construction Manager as Constructor
Page 57 AIA Document A133-2019 Exhibit A Guaranteed Maximum Price Amendment
Page 62 Section 005401 Preconstruction Services
Page 71 Section 005402 Supplementary Conditions
Page 77 Section 006113 Performance and Payment Bond
Page 78 Section 006210 Payroll Reports (LCPtracker)
Page 79 Section 006211 Subcontractor Payments (B2Gnow)
Page 80 Section 006212 Trust Fund Contributions and Dual Benefits
Page 81 Section 006220 Statement of Intent to Pay Prevailing Wages
Page 82 Section 006230 Affidavit of Wages Paid
Page 83 Section 006250 Retainage Option Form
Page 84 Section 006255 Escrow Agreement
Page 88 Section 006270 Statement of Apprentice / Journeyman Participation
Page 89 Section 006530 Social Equity Plan
Page 93 Public Works WMBE Inclusion Plan Change Request Form
Page 95 Section 007100 Specified General Conditions and Fee
Page 98 Section 007110 Cost Component Matrix
Page 103 Section 007200 General Conditions
Page 104 AIA Document A201-2017 General Conditions of the Contract for Construction
Page 178 Section 007300 Special Conditions
Page 179 Student and Community Workforce Agreement
Page 216 Section 007310 MWBE Subcontractor Inclusion Plan
Page 222 Section 007311 Acceptable Worksites
Page 224 Section 007319 Safety Procedures
Page 227 Section 007320 Supplemental Conditions Asbestos Abatement
Page 229 Section 007336 Social Equity in Contracting
Page 236 Section 007343 Wage Rates
Page 239 Section 011000 Summary of Work
Page 246 Section 011100 Summary of Hazardous Materials Work
Page 250 Good Faith Inspection Letter
Page 255 Section 012600 Contract Modification Procedures
Page 260 Section 012900 Applications for Payment
Page 266 Section 012973 Schedule of Values
Page 268 Section 013113 Project Coordination
Page 273 Section 013119 Meetings
Page 278 Section 013150 Project Management Communication
Page 282 Section 013216 Schedules and Reports
Page 297 Section 013300 Submittals
Page 304 Section 013313 Certificate of Compliance
Page 305 Section 013332 Certificate of No Hazardous Materials
Page 306 Section 014100 Regulatory Requirements
Page 309 Section 014150 Air Barrier Quality Control Requirements
Page 314 Section 014216 Definitions
Page 316 Section 014219 Reference Standards
Page 325 Section 014529 Testing Laboratory Services
Page 334 Section 015000 Construction Facilities & Temporary Controls
Page 339 Section 015526 Maintenance of Traffic
Page 341 Section 015719 Environmental Protection
Page 345 Section 016110 Materials and Equipment
Page 348 Section 016310 Approval for Substitution and Product Options
Page 353 Section 016510 Delivery, Storage and Handling
Page 356 Section 017123 Construction Layout
Page 359 Section 017125 Utility Location Requirements
Page 361 Section 017329 Cutting and Patching
Page 366 Section 017350 Alteration Project Procedures
Page 369 Section 017400 Cleaning
Page 373 Section 017419 Construction Waste Management
Page 382 Section 017510 Indoor Air Quality Requirements
Page 385 Section 017720 Contract Closeout
Page 392 Section 017736 Warranties and Bonds
Page 398 Section 017740 Warranty of Work After Final Payment
Page 399 Section 017823 Operating and Maintenance Data
Page 405 Section 017839 Project Record Documents
Page 407 Section 018113 Sustainable Design Requirements
Page 415 Materials Submittal Form 1
Page 416 Materials Submittal Form 2
Page 417 VOC Requirements
Page 418 VOC Submittal Form
Page 419 Section 019100 Commissioning