JSCEE Central Kitchen Renovation Phase II, Seattle, WA - SD Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 411 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Section 000101 Owner and Design Team Information
Page 3 Section 000110 Table of Contents
Page 5 AIA Document A133-2019 Standard Form of Agreement Between Owner and Construction Manager as Constructor
Page 48 AIA Document A133-2019 Exhibit A Guaranteed Maximum Price Amendment
Page 53 Section 006210 Payroll Reports (LCPtracker)
Page 54 Section 006211 Subcontractor Payments (B2Gnow)
Page 55 Section 006212 Trust Fund Contributions and Dual Benefits
Page 56 Section 006220 Statement of Intent to Pay Prevailing Wages
Page 57 Section 006230 Affidavit of Wages Paid
Page 58 Section 006270 Statement of Apprentice / Journeyman Participation
Page 59 Section 006530 Social Equity Plan
Page 63 Public Works WMBE Inclusion Plan Change Request Form
Page 65 Section 007200 General Conditions
Page 66 AIA Document A201-2017 General Conditions of the Contract for Construction
Page 140 Section 007300 Special Conditions
Page 141 Student and Community Workforce Agreement
Page 178 Section 007310 MWBE Subcontractor Inclusion Plan
Page 184 Section 007311 Acceptable Worksites
Page 186 Section 007319 Safety Procedures
Page 189 Section 007320 Supplemental Conditions Asbestos Abatement
Page 191 Section 007336 Social Equity in Contracting
Page 198 Section 007343 Wage Rates
Page 201 Section 011000 Summary of Work
Page 208 Section 011100 Summary of Hazardous Materials Work
Page 212 Good Faith Inspection Letter
Page 217 Section 012600 Contract Modification Procedures
Page 222 Section 012900 Applications for Payment
Page 228 Section 012973 Schedule of Values
Page 230 Section 013113 Project Coordination
Page 235 Section 013119 Meetings
Page 240 Section 013150 Project Management Communication
Page 244 Section 013216 Schedules and Reports
Page 259 Section 013300 Submittals
Page 266 Section 013313 Certificate of Compliance
Page 267 Section 013332 Certificate of No Hazardous Materials
Page 268 Section 014100 Regulatory Requirements
Page 271 Section 014150 Air Barrier Quality Control Requirements
Page 276 Section 014216 Definitions
Page 278 Section 014219 Reference Standards
Page 287 Section 014529 Testing Laboratory Services
Page 296 Section 015000 Construction Facilities & Temporary Controls
Page 301 Section 015526 Maintenance of Traffic
Page 303 Section 015719 Environmental Protection
Page 308 Section 016110 Materials and Equipment
Page 311 Section 016310 Approval for Substitution and Product Options
Page 316 Section 016510 Delivery, Storage and Handling
Page 319 Section 017123 Construction Layout
Page 322 Section 017125 Utility Location Requirements
Page 324 Section 017329 Cutting and Patching
Page 329 Section 017350 Alteration Project Procedures
Page 332 Section 017400 Cleaning
Page 336 Section 017419 Construction Waste Management
Page 345 Section 017510 Indoor Air Quality Requirements
Page 348 Section 017720 Contract Closeout
Page 355 Section 017736 Warranties and Bonds
Page 361 Section 017740 Warranty of Work After Final Payment
Page 362 Section 017823 Operating and Maintenance Data
Page 368 Section 017839 Project Record Documents
Page 370 Section 018113 Sustainable Design Requirements
Page 378 Materials Submittal Form 1
Page 379 Materials Submittal Form 2
Page 380 VOC Requirements
Page 381 VOC Submittal Form
Page 382 Section 019100 Commissioning
Page 391 Section 311000 Site Preparation
Page 398 Section 312200 Earthwork
Page 405 Section 314100 Trench Safety
Page 406 Section 321316 Flexible Paving
Page 409 Section 333000 Sanitary Sewer Utilities