JSCEE Central Kitchen Renovation Phase II, Seattle, WA - GC/CM Bid Manual    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 100 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 GC/CM Bid Manual
Page 2 Contents
Page 3 Project Summary
Page 6 Invitation to Bid
Page 7 Instructions to Bidders
Page 14 Forma Construction GCCM Work Plan
Page 34 Site Policies
Page 39 Forma Safety Standards
Page 44 Bid Package Responsibility Matrix
Page 49 Bid Form (To be Used by All Bid Packages)
Page 53 Scope of Work - BP 02.0 Demolition
Page 55 Scope of Work - BP 04.0 Structures
Page 60 Scope of Work - BP 08.0 Doors & Hardware
Page 62 Scope of Work - BP 09.1 Metal Stud Framing, GWB, and FRP
Page 65 Scope of Work - BP 09.2 Ceilings
Page 67 Scope of Work - BP 10.0 Miscellaneous Specialties
Page 71 Scope of Work - BP 21.0 Fire Suppression
Page 74 Scope of Work - BP 22.0 Mechanical (Excludes Refrigeration)
Page 78 Scope of Work - BP 22.1 Refrigeration (Alternate #4)
Page 81 Scope of Work - BP 26.0 Electrical
Page 85 Drawings Log
Page 90 Specifications Log
Page 94 Exhibit A Site Logistics
Page 95 Exhibit B Project Schedule
Page 96 Exhibit C Forma Standard Subcontract Terms & Conditions
Page 97 Exhibit D Owner / Contractor Agreement
Page 98 Exhibit E Contract Documents
Page 99 Exhibit F Social Equity Documents
Page 100 Exhibit G BIM Execution Plan