JSCEE Central Kitchen Renovation Phase II, Seattle, WA
Bid Stage 3 - Due 1/30/24 @ 2:00 pm - Closed to Bidding:
100% CD Bid Set Plans
100% CD Bid Set Plans - Mechanical Hood Worksheet
100% CD Bid Set Specs Volume 1
100% CD Bid Set Specs Volume 2
100% CD Bid Set Specs Volume 3
GC/CM Bid Manual
Exhibit A.1 - Site Logistics Plan
Exhibit A.2 - Work Phasing Plan
Exhibit A.3 - Tunnel Plan
Exhibit B - CPM Schedule
Exhibit C.1 - FORMA Subcontract Template
Exhibit C.2 - FORMA Subcontract Attachments
Exhibit D - PreConstruction Signed Agreement A133-2019
Exhibit E.1 - Geotech Report
Exhibit E.2 - Soil Testing Report
Exhibit E.3 - As-Built Plans
Exhibit E.4 - Plumbing As-Built Plans
Exhibit F - SCWA Contractor Primer
Exhibit G - BIM Work Plan
Addendum #1
Addendum #1 Plans
Addendum #2
Addendum #2 Plans
Addendum #3
Addendum #4
Addendum #4 Plans
Addendum #5
Bid Stage 2 - Due 11/29/23 @ 2:00 pm - Closed to Bidding:
BP 31.10 - Horizontal Underslab Excavation
50% CD Phase II Plans
50% CD Phase II & III Specs
Exhibit A.1 - Site Logistics Plan
Exhibit A.2 - Concrete Sawcuts Existing Below Slab Structural Detail Plans
Exhibit A.3 - Excavation Cross Section
Exhibit A.4 - Excavation Extent Dimensioned Plan
Exhibit A.5 - Plumbing As-Built Plans
Exhibit B - CPM Schedule
Addendum #1
Addendum #1 Attachment 2 Plan
Addendum #1 Attachment 3 Plan
Addendum #1 Attachment 4 Plan
Kitchen Equipment Contractor/CM (KEC/CM) RFQ Stage - Closed to Bidding:
Request for Qualifications
Exhibit A - Contract Documents
Exhibit B1 - Schematic Design Report
Exhibit B2 - Plans
Exhibit B2 - Structural Plans
Exhibit B3 - Food Service Equipment Specs & Brochures
Exhibit C - DD Coordination Plans
Exhibit D - Mechanical Foundation Plan
Exhibit E - Phasing Plans
Addendum #1 - Post KECCM Site Walk Q&A
Kitchen Equipment Contractor/CM (KEC/CM) RFFP Stage - Closed to Bidding:
Request for Final Fee Proposals
Exhibit A - Contract Documents
Exhibit B - Cost Responsibility Matrix
Exhibit C - Bid Form
Exhibit D - FORMA Subcontract Template
Bid Stage 1 - Due 08/01/23 @ 2:00 pm - Closed to Bidding:
BP 31.00 Bid Advertisement
BP 31.00 - Grease Interceptor, Utilities and Paving - Revised
SD Plans
SD Structural Plans
SD Specs
Exhibit A.1 - Site Logistics Plan
Exhibit A.2 - Sequence of Work
Exhibit A.3 - Asphalt Excavation Removal
Exhibit B - Grease Interceptor Schedule
Addendum #1
Register on this project.
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
GC/CM:
Forma Construction
500 Columbia St NW, Suite 201
Olympia, WA 98512
360-754-5788
Fax: 360-943-5868
Contacts:
Jared Larson, Senior Project Manager
206-714-3243
jaredl@formacc.com
Salman Usmani, Project Manager
434-466-6336
salman.usmani@formacc.com
Prebid: Bid Stage 3: 1/9, 1/11 & 1/16 @ 10:00 am at Seattle Public Schools, 2445 3rd Ave S, Seattle WA 98134
Description:
The JSCEE – CENTRAL KITCHEN RENOVATION PHASE II project is a 35,850 sq ft renovation of the central kitchen area including demolition of interior components with some select items for salvage, minor upgrades to the staff entry area, expansion of the kitchen area into the warehouse space, rooftop equipment removal, clean up and installation of new services in the basement tunnel and limited exterior work in the west drive aisle. As part of this renovation, the existing walk-in freezer space approximately 8,800 sq ft and built on a raised concrete slab will be removed and replaced with an insulated floor that would also accommodate a passive ventilation system to maintain above freezing conditions of the slab above. A major challenge is the installation and tie-ins of new plumbing lines with existing under-slab plumbing which were built integrated with existing grade beams and pile caps. Additionally, the black water sewer lines need to be separated from the kitchen area drain and dedicated as grease waste and discharged to a new grease interceptor. Options to perform major plumbing work are being evaluated by FORMA.