Hazen High School Phased Modernization, Renton, WA - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 924 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Division 00 Procurement and Contracting Requirements
Page 3 Section 000110 Table of Contents
Page 7 Section 003100 Available Project Information
Page 9 Subsurface Exploration, Geologic Hazard, and Geotechnical Engineering Report
Page 70 Hazardous Materials Survey Report
Page 382 Section 007300 Supplementary Conditions
Page 384 Confirmation of Background Check Form
Page 385 Section 007330 Non-Discrimination Policy
Page 387 Non-Discrimination Policy Statement
Page 388 Section 007343.01 Prevailing Wage Rate Requirements
Page 390 Inclusion Plan - Renton School District
Page 393 Hazen High School Phased Modernization - Subcontractor Outreach & Inclusion Plan
Page 399 Division 01 General Requirements
Page 400 Section 011100 Summary of Work
Page 402 Hazen High School Phased Modernization Inadvertent Archaeological and Historic Resources Discovery Plan
Page 404 Section 011110 Summary of Hazardous Materials Work
Page 408 Section 011400 Work Restrictions
Page 412 Section 012200 Unit Prices
Page 414 Section 012300 Alternates
Page 424 Section 012500 Substitution Procedures
Page 428 Substitution Request Form
Page 430 Section 012600 Contract Modification Procedures
Page 434 Change in the Work Cost Summary
Page 436 Request for Interpretation
Page 437 Order for a Minor Change in Work
Page 438 Construction Change Directive
Page 439 Change Order Request
Page 441 Change Order
Page 442 Section 012900 Payment Procedures
Page 446 Retained Percentage on Public Works Contract Form
Page 447 Escrow Agreement Form
Page 451 Summary of Entities Requesting Payment
Page 455 Section 012973 Schedule of Values
Page 457 Section 013100 Project Management and Coordination
Page 463 Section 013119 Project Meetings
Page 469 Section 013126.10 Communication Protocols
Page 471 Section 013127 Electronic Document Request
Page 473 Electronic Document Request Form
Page 474 Section 013216 Construction Progress Schedule
Page 480 Section 013233 Photographic Documentation
Page 482 Section 013300 Submittal Procedures
Page 490 Section 013523 Owner Safety Requirements
Page 492 Section 013553 Security Procedures
Page 494 Section 014000 Quality Requirements
Page 502 Section 014100 Regulatory Requirements
Page 504 Section 014200 References
Page 508 Section 014516.10 Field Engineering
Page 512 Section 014516.13 Contractor Quality Control
Page 518 Notice of Non-Compliance Form
Page 520 Daily Work Log Form
Page 525 Section 015000 Temporary Facilities and Controls
Page 533 Section 015713 TESC
Page 542 Section 016000 Product Requirements
Page 546 Section 016605 Off-Site Stored Materials Requirements
Page 548 Section 017300 Execution
Page 554 Section 017400 Cleaning and Waste Management
Page 558 Section 017419 Construction Waste Management and Disposal
Page 560 Building or Remodeling in King County
Page 562 Construction and Demolition Waste Acknowledgement Form
Page 563 Construction and Demolition Waste Diversion Form
Page 565 Section 017700 Closeout Procedures
Page 569 Certificate of Substantial Completion
Page 570 Contractor's Affidavit of Payment of Debts and Claims
Page 572 Contractor's Affidavit of Release of Liens
Page 574 Consent of Surety to Final Payment
Page 575 Subcontractor's Affidavit of Payment for Labor and Materials and Final Release and Indemnity Agreement
Page 578 Substantial Completion Checklist
Page 580 Final Completion Checklist
Page 582 Section 017823 Operation and Maintenance Data
Page 584 Section 017836 Warranties
Page 586 Contractor's Warranty
Page 587 Subcontractor's Warranty
Page 588 Section 017839 Project Record Documents
Page 590 Section 017900 Demonstration and Training
Page 592 Section 018113 Sustainable Design Requirements
Page 602 WSSP 2023 Scorecard
Page 605 Division 02 Existing Conditions
Page 606 Section 026500 UST Decommissioning
Page 618 Section 028200 Asbestos Abatement
Page 639 Section 028300 Lead-Related Activities
Page 645 Division 03 Concrete
Page 646 Section 030100 Concrete Repair
Page 652 Section 031000 Concrete Forming and Accessories
Page 664 Section 032000 Concrete Reinforcing
Page 670 Section 033000 Cast-In-Place Concrete
Page 682 Section 033500 Concrete Curing and Finishing
Page 688 Division 07 Thermal and Moisture Protection
Page 689 Section 078400 Firestopping
Page 697 Firestop Schedule of Through Penetration Systems
Page 699 Schedule of Joint Firestop Systems
Page 700 Division 21 Fire Suppression
Page 701 Section 210000 Fire Suppression Work Specified in Division 23
Page 702 Section 211000 Automatic Fire Suppression Systems
Page 716 Division 23 Heating, Ventilating, and Air Conditioning (HVAC)
Page 717 Section 230500 General Provisions
Page 734 Section 230505 Project Closeout and System Start-Up
Page 738 Section 230510 Basic Materials and Methods
Page 754 Section 230513 Electrical Provisions for Mechanical Work
Page 760 Section 230520 Mechanical Demolition
Page 763 Section 230810 Systems Training
Page 769 Section 230820 Systems Operations and Maintenance Manuals
Page 774 Section 232113 Hydronic Piping Systems
Page 790 Section 232140 Vertical Bore Hole Geothermal Loop Heat Exchanger Piping
Page 801 Section 232500 Water Treatment
Page 808 Division 31 Earthwork
Page 809 Section 311000 Site Preparation
Page 822 Section 312200 Earthwork
Page 838 Section 314133 Trench Safety
Page 839 Division 32 Exterior Improvements
Page 840 Section 321216 Asphalt Paving
Page 845 Section 321313 Concrete Paving
Page 851 Section 321313.23 Concrete Paving Surface Treatment
Page 854 Section 321540 Permeable Crushed Rock Base
Page 859 Section 321723 Pavement Markings
Page 862 Section 321813 Synthetic Grass Surfacing
Page 874 Section 321823.49 Elastic Layer
Page 878 Section 323000 Site Improvements
Page 880 Section 323113 Chain Link Fences and Gates
Page 884 Section 323800 Irrigation
Page 895 Section 323900 Planting
Page 910 Division 33 Utilities
Page 911 Section 333000 Sanitary Sewer
Page 915 Section 334000 Storm Drainage
Page 922 Section 334600 Subdrainage