Hazen High School Phased Modernization, Renton, WA
Phase II Documents for BP 21.00 Fire Suppression & BP 32.10 Site Development:
Advertisement
Plans
Survey Plans
Specs
Specs - Hazardous Materials Survey Report - Appendix A Field Sketches
Bid Manual
Exhibit A.1 - Site Logistics Plan
Exhibit D.1 - CPM Project Schedule
Exhibit E.1 - FORMA Master Subcontract Agreement
Exhibit E.2 - FORMA Master Purchase Order
Exhibit E.3 - FORMA P&P Bond
Exhibit E.4 - FORMA Retention Bond
Exhibit E.5 - FORMA Subcontractor Inclusion Plan Template
Exhibit E.6 - Subcontractor Apprenticeship Utilization
Exhibit F.1 - A113-2009 Owner Contractor Agreement
Exhibit F.2 - A201-2007 General Conditions of the Contract
Exhibit G.1 - Preliminary Hazardous Materials Survey - February 2024
Exhibit G.2 - Hazardous Materials Survey - March 2025
Exhibit G.2 - Hazardous Materials Survey - Appendix A Field Sketches
Exhibit G.3 - UST Closure Technical Memorandum - September 2024
Exhibit G.4 - Geotechnical Report - August 2024
Exhibit G.5 - Thermal Conductivity Borings & Test Loop Install - August 2024
Exhibit G.6 - Ground-Source Well Testing Results - August 2024
Exhibit G.7 - Existing As-Built Drawings for Fire Suppression Systems
Addendum #1
Addendum #1 Plans
Addendum #1 Bid Manual
Addendum #1 Exhibit G.8 - BIM Implementation Plan
Addendum #1 Exhibit G.9 - Tree Retention & Land Clearing Plan
Addendum #1 Exhibit G.9 - Tree Retention & Land Clearing Plan - Apx. B & C Plans
Phase III Documents:
Invitation to Bid
Plans Volume 1
Plans Volume 1 - Survey Plans
Plans Volume 2
Specs Volume 1
Specs Volume 2
Specs Volume 3
Bid Manual
Exhibit A.1 - Site Logistics Plan
Exhibit D.1 - CPM Project Schedule
Exhibit E.1 - FORMA Master Subcontract Agreement
Exhibit E.2 - FORMA Master Purchase Order
Exhibit E.3 - FORMA P&P Bond
Exhibit E.4 - FORMA Retention Bond
Exhibit E.5 - FORMA Subcontractor Inclusion Plan Template
Exhibit E.6 - Subcontractor Apprenticeship Utilization
Exhibit F.1 - A113-2009 Owner Contractor Agreement
Exhibit F.2 - A201-2007 General Conditions of the Contract
Exhibit G.1 - Preliminary Hazardous Materials Survey - February 2024
Exhibit G.2 - Hazardous Materials Survey - March 2025
Exhibit G.2 - Hazardous Materials Survey - March 2025 - Field Sketches Plans
Exhibit G.3 - UST Closure Technical Memorandum - September 2024
Exhibit G.4 - Geotechnical Report - August 2024
Exhibit G.5 - Thermal Conductivity Borings & Test Loop Install - August 2024
Exhibit G.6 - Ground-Source Well Testing Results - August 2024
Exhibit G.7 - Existing As-Built Drawings for Fire Suppression Systems
Exhibit G.8 - BIM Implementation Plan
Exhibit G.9 - Tree Retention & Land Clearing Plan
Exhibit G.9 - Tree Retention & Land Clearing Plan - Appendix B & C Plans
Register on this project.
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
GC/CM:
FORMA Construction
1016 1st Ave S, Suite 400
Seattle, WA 98134
206-626-0256
Fax: 360-943-5868
Contacts:
Jesse Favia, Project Manager
206-626-0256
jessef@formacc.com
Joel Brown, Estimator
360-754-5788
joelb@formacc.com
Notes:
Optional Pre-Bid Information Meeting: 4/29 @ 11:00 am
Hazen High School, 1101 Hoquiam Ave NE Renton, WA 98059
MS TEAMS Meeting ID: 270 384 777 657 6 | Passcode: Qg3kF6aC
On-Site Job Walk: 4/30 @ 2:30 pm
Hazen High School, 1101 Hoquiam Ave NE Renton, WA 98059
SCOPES BIDDING:
Bid Date/Time: Thursday April 24, 2025
* Indicates bid package FORMA intends to bid on.
2:00PM - BP 21.00 – Fire Suppression | *BP 31.00 – Earthwork & Utilities
Bid Date/Time: Tuesday May 13, 2025
* Indicates bid package FORMA intends to bid on.
1:00PM - BP 02.00 – Demolition & Abatement | *BP 06.10 – Casework & Finish Carpentry | *BP 7.20 – Building Envelope | *BP 8.0 0– Doors & Hardware
2:00PM - ‡BP 22.1 – Hydronic Piping | ‡BP 23.1 – Sheet Metal | ‡BP 23.2 – Building Controls | ‡BP 23.3 – Mechanical Insulation | ‡BP 23.4 – Test & Balance. ‡Scope will bid to Eagle Harbor
3:00PM - †BP 27.1 – Data Cabling | †BP 27.2 – Classroom & Commons AV | †BP 27.3 – Intercom & Clock System | †BP 27.4 – Distributed Antenna System
4:00PM - †BP 28.1 – Access Controls System & Video Surveillance | †BP 28.4 – Addressable Fire Alarm System. †Scope will bid to Sare Electric
Bid Date/Time: Wednesday May 14, 2025
* Indicates bid package FORMA intends to bid on.
1:00PM - BP 09.00 – GWB & Light Gauge Framing | BP 09.10 – Ceilings & Acoustical Wall Panels | BP 09.20 - Flooring
2:00PM - BP 9.4 – Paint & Coatings | BP 11.00 – Food Service Equipment | *BP 10.00 – Miscellaneous Specialties | BP 07.10 – Membrane Roofing
3:00PM - *BP 03.00 – Structure
Description:
The HAZEN HIGH SCHOOL PHASED MODERNIZATION PROJECT is a four year-long 320,000 square foot tenant improvement to the existing Hazen High School. Upgrades include a complete mechanical system replacement with a ground-source well system and supporting electrical system improvements; a seismic retrofit of the existing pre-cast concrete structure; new roof; remodel of eight new science classrooms on the 1st & 2nd floors of the main classroom building; life-safety system upgrades; common space updates; and athletic field improvements. The work will be completed in four phases during summers and the school year while the building is occupied and fully functional. As part of the GCCM Alternative Selection process Eagle Harbor Associates was selected as MCCM and Sare Electric was selected as ECCM.