SIHB Thunderbird Treatment Facility, Vashon, WA
Documents:
Bid Plans
Bid Specs
Attachment R - General Inclusions & Exclusions
Limited Asbestos & Lead Survey
Proposal for Geotechnical Feasibility Study
Infiltration Test Report
Soil Bearing Capacity
Addendum #1
Addendum #1 Plans
Bid Packages:
Bid Package #2.00 - Demolition
Bid Package #3.10 - Reinforcing Installation
Bid Package #3.20 - Reinforcing Steel Supply
Bid Package #4.00 - Masonry
Bid Package #5.00 - Structural Steel FOB
Bid Package #6.10 - Finish Carpentry
Bid Package #7.10 - Building Insulation
Bid Package #7.20 - Roofing
Bid Package #7.30 - Siding & Trims
Bid Package #8.00 - Door, Frames & Hardware
Bid Package #8.30 - Aluminum Storefronts
Bid Package #9.00 - Metal Stud Framing & Drywall
Bid Package #9.40 - Flooring
Bid Package #9.90 - Painting
Bid Package #12.00 - Casework
Bid Package #31.00 - Earthwork & Underground Utilities
Register as a Bidding Subcontractor and be notified of new docs on this project.
Builders Exchange of Washington, Inc. Subs and Suppliers
Bids to:
Korsmo Construction
1940 East D Street
Tacoma, WA 98421
Contact: Zane Andersson
zandersson@korsmo.com
Prebid: Job Walk: 12/17 @ 10:00 am, Demolition Job Walk: 12/13 @ 10:00 am
Description:
Convert the existing building into a 92-bed residential treatment facility to provide culturally attuned care for the Native American community. The project will consist of the renovation of an existing building that formerly served as an assisted living and memory care facility.The center will focus on treating drug and alcohol addiction, as well as other forms of addiction. It is not a detoxification facility.
Korsmo Construction has been chosen to be the general contractor.
* Assume Commercial State & Federal Prevailing Wage which ever is the greater.
* There is still opportunity to make changes so if you have any VE ideas please share as an alternate.