Rebid Green Lake Community Boathouse, City of Seattle, WA #2020-071 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 1647 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Section 000010 Table of Contents
Page 9 Division 00 - Bidding Requirements, Contract Forms, & Conditions of the Contract
Page 10 Section 001113 Pre-Bid Information and Advertisement for Bid
Page 12 Advertisement for Bid
Page 14 Section 002113 Instructions to Bidders
Page 32 Bid Form
Page 33 Section 004100 Bid Form
Page 38 Inclusion Plan
Page 44 Bidder/Subcontractor List
Page 45 Section 004393 Bid Submittal Checklist
Page 47 Section 005200 Agreement Form
Page 50 Section 006000 Sample Forms
Page 51 Social Equity Plan
Page 55 Public Works WMBE Inclusion Plan Change Request Form
Page 57 Payment and Performance Bond
Page 60 Supplemental Bidder Responsibility Criteria Form (SBRC)
Page 68 Bond in Lieu of Retained Funds
Page 70 Public Works Prevailing Wage Certification & Subcontractor List
Page 71 Subcontractor Approval Application
Page 74 Competent Person Evaluation
Page 76 Project Labor List - Contractor
Page 77 Community Workforce Agreement
Page 118 Section 007200 General Conditions
Page 246 Section 007300 Modifications to General Conditions
Page 255 Section 007316 Insurance Requirements
Page 263 Section 007343 Prevailing Wage Rate Requirements
Page 270 Section 008010 Contractor Performance
Page 271 Construction Contracts 360 Performance Review (2020 Standards)
Page 279 Division 01 - General Requirements
Page 280 Section 013515 LEED Certification Requirements
Page 298 LEED Scorecard
Page 299 Product Data Reporting Form for LEED v4 Projects
Page 300 Section 014339 Mockups
Page 303 Section 015639 Temporary Tree, Vegetation, and Soil Protection
Page 316 Section 015719 Temporary Environmental Pollution Control
Page 326 Section 015721 Construction Indoor Air Quality Management
Page 335 Section 017419 Construction Waste Material and Disposal
Page 344 Seattle/King County Waste Characterization Form
Page 348 Section 019113 General Commissioning Requirements
Page 355 Division 02 - Existing Conditions
Page 356 Section 024116.13 Structure Demolition and Deconstruction
Page 362 Division 03 - Concrete
Page 363 Section 031000 Concrete Formwork
Page 366 Section 032000 Concrete Reinforcement
Page 369 Section 033000 Cast in Place Concrete
Page 380 Section 033500 Concrete Finishing
Page 386 Section 033536 Polished Concrete Finishing
Page 393 Section 033713 Shotcrete
Page 400 Section 034123 Precast Concrete Stairs
Page 410 Section 035400 Cast Underlayment
Page 417 Division 05 - Metals
Page 418 Section 050513 Shop-Applied Coatings for Metal
Page 425 Section 051200 Structural Steel
Page 435 Section 055000 Metal Fabrications
Page 443 Section 055200 Metal Handrails & Guardrails
Page 446 Section 057100 Decorative Metal Stairs
Page 455 Division 06 - Wood & Plastics
Page 456 Section 061000 Rough Carpentry
Page 465 Section 061200 Structural Insulated Panels
Page 471 Section 061600 Sheathing
Page 475 Section 061800 Glue-Laminated Construction
Page 481 Section 064100 Architectural Wood Casework
Page 489 Section 067400 Composite Grating
Page 493 Division 07 - Thermal & Moisture Protection
Page 494 Section 071300 Sheet Waterproofing
Page 498 Section 071400 Fluid Applied Waterproofing
Page 503 Section 072100 Thermal Insulation
Page 516 Section 072500 Water Resistive Barriers
Page 530 Section 074113 Metal Roof Panels
Page 538 Section 074213 Metal Wall Panels
Page 546 Section 075400 Thermoplastic Membrane Roofing
Page 555 Section 076200 Sheet Metal Flashing and Trim
Page 563 Section 077200 Roof Accessories
Page 567 Section 078400 Firestopping
Page 574 Section 079200 Sealants and Caulks
Page 584 Division 08 - Doors & Windows
Page 585 Section 081000 Steel Doors and Frames
Page 596 Section 083100 Access Doors and Panels
Page 603 Section 083613 Sectional Doors
Page 611 Section 084313 Aluminum Framed Entrances and Storefronts
Page 626 Section 087000 Building Hardware
Page 657 Section 087113 Automatic Door Operators
Page 667 Section 088000 Glazing
Page 676 Section 088300 Mirrors
Page 681 Division 09 - Finishes
Page 682 Section 092900 Gypsum Wallboard
Page 687 Section 095100 Acoustical Ceilings
Page 695 Section 096500 Resilient Flooring
Page 704 Section 096513 Resilient Base
Page 709 Section 096723 Resinous Flooring
Page 722 Section 099113 Exterior Painting
Page 735 Section 099123 Interior Painting
Page 752 Section 099300 Ceramic Tile
Page 761 Section 099623 Graffiti Resistant Coatings
Page 773 Division 10 - Specialties
Page 774 Section 101400.13 Park Identification Rainbow Sign
Page 777 Section 101400.23 Building Signage
Page 784 Section 102113 Toilet Partitions
Page 792 Section 102600 Wall and Corner Protection
Page 796 Section 102813 Toilet Accessories
Page 805 Section 104400 Fire Protection Specialties
Page 810 Section 108013 Miscellaneous Specialties
Page 812 Division 11 - Equipment
Page 813 Section 110114 Fall Arrest & Fall Restraint System
Page 819 Division 12 - Furnishings
Page 820 Section 122413 Roller Window Shades
Page 827 Section 123200 Manufactured Wood Casework
Page 839 Section 123600 Countertops
Page 845 Section 124813 Entrance Floor Mats and Grilles
Page 850 Section 129300 Site Furnishings
Page 853 Division 14 - Conveying Equipment
Page 854 Section 142010 Passenger Elevators
Page 868 Division 21 - Fire Suppression Systems
Page 869 Section 210000 Fire Suppression General Conditions
Page 879 Section 210500 Common Work Results for Fire Suppression
Page 891 Section 211316 Dry Pipe Sprinkler Systems
Page 895 Division 22 - Plumbing
Page 896 Section 220000 Plumbing General Conditions
Page 910 Section 220500 Common Work Results for Plumbing
Page 925 Section 220700 Plumbing Insulation
Page 929 Section 220800 Commissioning of Plumbing
Page 933 Section 221005 Domestic Water Piping
Page 945 Section 221316 Sanitary Waste, Vent, and Storm Piping
Page 951 Section 223000 Plumbing Equipment
Page 954 Section 224000 Plumbing Fixtures
Page 962 Section 224000 Plumbing Fixtures
Page 970 Division 23 - Heating, Ventilating, and Air Conditioning (HVAC)
Page 971 Section 230000 HVAC General Conditions
Page 989 Section 230500 Common Work Results for HVAC
Page 1005 Section 230593 Testing, Adjusting, and Balancing
Page 1012 Section 230700 HVAC Insulation
Page 1020 Section 230800 Commissioning of HVAC
Page 1025 Section 230900 Instrumentation and Control for HVAC
Page 1033 Section 232300 Refrigerant Piping
Page 1037 Section 233100 HVAC Ducts and Casings
Page 1044 Section 233300 Air Duct Accessories
Page 1053 Section 233400 HVAC Fans
Page 1055 Section 233700 Air Outlets and Inlets
Page 1058 Section 237200 Energy Recovery Units
Page 1061 Section 238126 Split System Air Conditioners & Heat Pumps
Page 1065 Section 238323 Electric Heating Units
Page 1067 Division 26 - Electrical
Page 1068 Section 260500 Electrical General Work
Page 1084 Section 260519 Low-Voltage Electrical Power Conductors and Cables
Page 1090 Section 260526 Grounding and Bonding for Electrical Systems
Page 1100 Section 260529 Hangers and Supports for Electrical Systems
Page 1110 Section 260533 Raceways and Boxes for Electrical Systems
Page 1127 Section 260543 Underground Ducts and Raceways for Electrical Systems
Page 1140 Section 260553 Identification for Electrical Systems
Page 1149 Section 260573.13 Short-Circuit Studies
Page 1156 Section 260573.16 Coordination Studies
Page 1167 Section 260573.19 Arc-Flash Hazard Analysis
Page 1175 Section 260800 Commissioning of Electrical Systems
Page 1183 Section 260923 Lighting Control System
Page 1201 Section 262416 Panelboards
Page 1214 Section 262726 Wiring Devices
Page 1224 Section 262813 Fuses
Page 1228 Section 262816 Enclosed Switches and Circuit Breakers
Page 1240 Section 265119 LED Interior Lighting
Page 1253 Section 265600 Exterior Lighting
Page 1255 Division 27 - Communications
Page 1256 Section 270500 Common Work Results for Communications
Page 1268 Section 270533 Raceways and Boxes for Communication Systems
Page 1275 Division 28 - Electronic Safety and Security
Page 1276 Section 283100 Fire Detection and Alarm
Page 1298 Division 31 - Earthwork
Page 1299 Section 310000 Earthwork
Page 1310 Section 311000 Site Preparation
Page 1318 Section 311100 Clearing & Grubbing
Page 1321 Section 311313 Tree & Plant Removal
Page 1323 Section 312319 Dewatering
Page 1326 Section 315000 Excavation Support and Protection
Page 1330 Section 316323 Augered Concrete Piles
Page 1341 Division 32 - Exterior Improvements
Page 1342 Section 321123 Mineral Aggregates
Page 1355 Section 321216 Asphalt Paving for Service Roads & Parking Lots
Page 1361 Section 321216.13 Asphalt Paving for Pathways
Page 1366 Section 321313 Concrete Paving
Page 1373 Section 321313.13 Pervious Concrete Paving
Page 1382 Section 321413.13 Precast Concrete Masonry Unit Paving
Page 1387 Section 328000 Irrigation Systems
Page 1414 Section 329113 Soil Preparation
Page 1424 Section 329300 Landscape Planting
Page 1436 Section 329301 Modified Landscape Warranty
Page 1441 Division 33 - Utilities
Page 1442 Section 331000 Water Distribution Systems
Page 1453 Section 331013 Potable Water Systems for Drinking Fountains
Page 1459 Section 333000 Sanitary Sewerage Utilities
Page 1464 Section 333400 Storm Drainage Utilities
Page 1472 Appendix
Page 1473 Geotechnical Engineering Report
Page 1531 Letter of Addendum to Geotechnical Engineering Report
Page 1533 Revised Geotechnical Plan Review and Minimum Risk Letter
Page 1535 Asbestos and Lead Survey Results for the Greenlake Shell House Building
Page 1546 Asbestos and Lead Survey Results for the Greenlake Boathouse Building
Page 1565 Asbestos and Lead Survey Results for the Greenlake Community Center Building
Page 1573 Consent Decree