Green Lake Branch (GLK) URM Seismic Upgrade & Renovation (Re-Bid), The Seattle Public Library (SPL), City of Seattle, WA #2022-GLK-URM-Re-Bid - Plans
G000 Cover Sheet
G001 General Information
G200 Building Code Summary
G220 Fire & Life Safety Plans
G230 Energy Code Summary
SV1 Existing Site Survey
SV2 Existing Site Survey
C1.0 TESC and Demolition Plan
C1.1 CSC-Soil Plan
C1.2 CSEC Details
C2.0 Civil Site Plan
C2.1 DWC-DCI
C3.0 Notes and Details
C3.1 Details
C3.2 Site Sections
AD000 Site Demolition Plan
AS000 Architectural Site Plan
AS450 Site Ramp Details
AS451 Loading Dock Details
AS452 Entry Plaza Details
AS453 Solid Waste Enclosure Details
AS460 Exterior and Site Details
AD100 Lower Level Demolition Plan
AD101 Upper Level Demolition Plan
AD102 Attic Demolition Plan
AD103 Roof Demolition Plan
A100 Lower Level Floor Plan
A101 Upper Level Floor Plan
A102 Attic Plan
A103 Roof Plan
A200 Lower Level RCP
A201 Upper Level RCP
A202 Attic RCP
A300 Building Elevations
A301 Building Elevations
A302 Building Elevations
A310 Building Sections
A311 Building Sections
A312 Building Sections
A313 Building Sections
A400 Exterior Wall Assemblies
A401 Floor & Roof Assemblies
A410 Window & Storefront Schedule
A420 Exterior Details
A421 Exterior Details
A422 Exterior Details
A500 Elevator
A501 Entry Stair
A502 Mechanical Stair
A510 Enlarged Plans
A511 Enlarged Plans
A600 Interior Elevations
A601 Interior Elevations
A602 Interior Elevations
A603 Interior Elevations
A700 Interior Assemblies
A701 Typical Partition Details
A710 Interior Details, Lower Level
A711 Interior Details, Upper Level
A730 Elevator Details
A800 Casework Details
A801 Casework Details
A802 Casework Details
A900 Finish Schedule
A910 Door Schedule
S001 General Structural Notes
S002 General Structural Notes, Cont.
S003 Statement of Special Inspections
Sh1 General Shoring Notes
Sh2 Shoring Plan & Details
S100 Lower Level and Foundation Plan
S101 First Floor Framing Plan
S102 Attic Framing Plan
S103 Roof Framing Plan
S300 Typical Concrete Details
S301 Typical Concrete Details
S330 West Moment Frame Foundation Details
S331 East Moment Frame Foundation Details
S340 East Moment Frame Foundation Details
S400 Wood Framing Details
S500 Moment Frame Details
S501 Typical Steel Details
S510 Light Gauge Steel Details
S520 Framing Details
S530 North Moment Frame Details
S540 East / West Moment Frame Details
M001 Legend, Mechanical Notes and Drawing Index
M002 Mechanical Schedules
M003 Points List and Sequence of Operations
M101 Lower Level Mechanical Demolition Plan
M102 Upper Level Mechanical Demolition Plan
M103 Roof Mechanical Demolition Plan
M201 Lower Level HVAC Plan
M202 Upper Level HVAC Plan
M203 Attic Level HVAC Plan
M300 Mechanical Roof Plan
M401 Mechanical Diagrams
M501 Mechanical Details
M502 Mechanical Details
P001 Plumbing Legend, Notes and Index
P002 Plumbing Schedules
P201 Lower Level Plumbing Demolition Plan
P202 Upper Level Plumbing Demolition Plan
P300 Plumbing Foundation Plan
P401 Lower Level Plumbing Plan
P402 Upper Level Plumbing Plan
P403 Attic Level Plumbing Plan
P500 Plumbing Roof Plan
P601 Domestic Water Risers
P701 Waste and Vent Risers
P801 Plumbing Details
F001 Fire Protection Notes and Legend
F101 Lower Level Fire Protection Plan
E100 Legend
E101 Site Plan - Electrical
E200 Lower Level Floor Plan
E201 Upper Level Floor Plan - Lighting
E202 Roof Plan - Lighting
E300 Lower Level Floor Plan - Power
E301 Upper Level Floor Plan - Power
E302 Roof Plan - Power
E400 Lower Level Floor Plan - Comm
E401 Upper Level Floor Plan - Comm
E500 Lower Level Floor Plan - ESS
E501 Upper Level Floor Plan - ESS
E600 One Line Diagram
E601 Rack Elevations
E700 Lighting Fixture Schedule
E701 Lighting Control Schedule
E800 Mechanical Equipment Connection Schedule and Panel Schedules
ED100 Lower Level Demo Plan
ED101 Upper Level Demo Plan
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.