Arlington High School Addition and Renovation, Arlington School District, Arlington, WA - Conformed Plans
G0.00 Cover Sheet
G0.01 Sheet Index & Project Information
G1.01 Code Analysis
G1.02 Code Analysis
G2.01 Egress Diagrams
G3.00 Energy Code Analysis
AD2.01 Demolition Floor Plans
AD3.01 Demolition RCPs
AD4.01 Demolition Roof Plans
AD5.01 Demolition Elevations
AD6.01 Existing Photographs
A0.01 Abbreviations Symbols and Project Notes
A0.02 Wall Types
A0.03 Rated and Acoustic Assembly Details
A1.01 Architectural Site Plan
A1.11 Enlarged Site Plans & Site Details
A2.01 Overall First Floor Plan
A2.02 Overall Second Floor Plan
A2.03 Overall Equipment Platform Floor Plan
A2.11 First Floor Plan - Classroom Addition
A2.12 First Floor Plan - Scene Shop
A2.13 First Floor Plan - Admin
A2.21 Second Floor Plan - Classroom Addition
A2.31 Equipment Platform Plan - Classroom Addition
A2.41 Enlarged Floor Plans
A3.11 First Floor RCP - Classroom Addition
A3.12 First Floor RCP - Scene Shop
A3.13 First Floor RCP - Admin
A3.21 Second Floor RCP - Classroom Addition
A3.31 Ceiling Details
A4.11 Roof Plan - Classroom Addition
A4.12 Roof Plan - Scene Shop
A4.21 Roof Details
A4.22 Roof Details
A5.11 Exterior Elevations
A5.12 Exterior Elevations
A5.21 Exterior Details
A5.22 Exterior Details
A6.01 Building Sections
A6.02 Building Sections
A6.11 Wall Sections
A6.12 Wall Sections
A6.13 Wall Sections
A6.14 Wall Sections
A6.15 Wall Sections
A6.16 Wall Sections
A7.01 Stair Plans, Stair Sections and Details
A7.02 Bridge Railing Plan, Elevations, and Details
A8.00 Typical Interior Elevations Notes & Details
A8.01 Interior Elevations
A8.02 Interior Elevations
A8.03 Interior Elevations
A8.04 Interior Elevations
A8.05 Interior Elevations
A9.00 Finish Legend & Notes
A9.11 First Floor Finish Plan - Classroom Addition
A9.12 First Floor Finish Plan - Scene Shop
A9.13 First Floor Finish Plan - Admin
A9.21 Second Floor Finish Plan - Classroom Addition
A9.31 Interior Details
A9.32 Interior Details
A9.41 Signage Schedule, Types & Mounting Heights
A10.00 Door Schedule & Door Types
A10.01 Frame Types
A10.02 Relite Types
A10.11 Door & Frame Details
A10.12 Door & Frame Details
A10.21 Window & Louver Types
A10.31 Window & Storefront Details
A10.32 Storefront Details
A10.33 Storefront & Louver Details
A10.34 Storefront and Louver Details
A11.20 Exterior Elevations - Alternate Bids
A11.21 Exterior Elevations - Alternate Bids
A11.22 Exterior Elevations - Alternate Bids
A11.23 Exterior Elevations - Alternate Bids
A11.24 Soffit Plan - Alternate Bids
S1.11 General Notes
S1.12 General Notes
S1.13 General Notes
S1.14 Wind Uplift Map - Classroom Addition
S2.01 Foundation Plan - Classroom Addition
S2.02 Foundation Plan - Scene Shop
S2.03 Foundation Plan - Admin
S2.11 Grade Level Framing Plan - Classroom Addition
S2.12 Grade Level Framing Plan - Scene Shop
S2.21 Second Floor Framing Plan - Classroom Addition
S2.31 Equipment Platform Framing Plan - Classroom Addition
S2.41 Roof Framing Plan - Classroom Addition
S2.42 Roof Framing Plan - Scene Shop
S3.11 Foundation Details
S3.12 Foundation Details
S3.13 Foundation Details
S3.14 Foundation Details
S4.11 Steel Framing Details
S4.12 Steel Framing Details
S4.13 Steel Framing Details
S4.14 Steel Framing Details
S4.21 Braced Frame Elevations
S4.22 Braced Frame Details
S4.23 Braced Frame Details
S5.11 Cold Formed Steel Details
S5.12 Cold Formed Steel Details
S5.13 Cold Formed Steel Details
S5.14 Cold Formed Steel / Masonry Veneer & CMU Details
S6.11 Steel Roof Framing Details
S6.12 Steel Roof Framing Details
S6.13 Steel Roof Framing Details
S6.14 Steel Roof Framing Details
M0.01 Mechanical Legend
M0.02 Mechanical Schedules
MD1.01 Mechanical Demolition Plan
M2.11 First Floor Mechanical Reflected Ceiling Plan - Addition
M2.12 First Floor Mechanical Reflected Ceiling Plan - Scene Shop
M2.13 First Floor Mechanical Reflected Ceiling Plan - Admin
M2.21 Second Floor Mechanical Reflected Ceiling Plan - Addition
M3.11 First Floor Mechanical Plan - Addition
M3.12 First Floor Mechanical Plan - Scene Shop
M3.13 First Floor Mechanical Plan - Admin
M3.21 Second Floor Mechanical Plan - Addition
M3.31 Equipment Platform Mechanical Plan - Addition
M3.32 Equipment Platform Mechanical Piping Plan - Addition
M3.41 Roof Plan - Scene Shop
M3.51 Mechanical Section
M3.52 Mechanical Section
M3.53 Mechanical Section
M3.54 Mechanical Section
M4.01 Mechanical Details
M4.02 Mechanical Details
M5.01 Mechanical Controls
M5.02 Mechanical Controls
P0.01 Plumbing Legend
P0.02 Plumbing Schedules
P2.01 Foundation Plumbing Plan - Classroom Addition
P3.01 First Floor Plumbing Plan - Classroom Addition
P3.02 Second Floor Plumbing Plan - Classroom Addition
P3.03 Plumbing Floor Plan - Equipment Platform
P3.04 Foundation & First Floor Plumbing Plan - Scene Shop
P4.01 Plumbing Details
FX101 Fire Protection Criteria Drawings
FA0.01 Fire Alarm System Legend and Notes
FA0.02 Fire Alarm System Riser Diagram and Notes and Sequence of Operations
FAD1.13 First Floor Fire Alarm Demolition Plan - Admin
FA1.11 First Floor Fire Alarm Plan - Classroom Addition
FA1.12 First Floor Fire Alarm Plan - Scene Shop
FA1.13 First Floor Fire Alarm Plan - Admin
FA2.21 Second Floor Fire Alarm Plan - Classroom Addition
FA2.31 Equipment Platform Fire Alarm Plan - Classroom Addition
E0.01 Electrical Legend
E0.02 General Notes and Abbreviations
E0.03 Lighting Schedules and Sequence of Operation
E0.04 Mechanical Equipment Schedule
ED1.01 Overall Electrical Site Demolition Plan
ED2.01 Electrical Demolition Plans
ED4.01 Systems Demolition Plan
E1.01 Overall Electrical Site Plan
E2.11 First Floor Lighting Plan - Classroom Addition
E2.12 First Floor Lighting Plan - Scene Shop
E2.13 First Floor Lighting Plan - Admin
E2.21 Second Floor Lighting Plan - Classroom Addition
E2.31 Equipment Platform Lighting Plan - Classroom Addition
E3.11 First Floor Power Plans - Classroom Addition
E3.12 First Floor Power Plan - Scene Shop
E3.13 First Floor Power Plan - Admin
E3.21 Second Floor Power Plan - Classroom Addition
E3.31 Equipment Platform Power Plan - Classroom Addition
E4.01 Overall First Floor Systems Plan
E4.02 Overall Second Floor Systems Plan
E4.11 First Floor Systems Plan - Classroom Addition
E4.12 First Floor Systems Plan - Scene Shop
E4.13 First Floor Systems Plan - Admin
E4.21 Second Floor Systems Plan - Classroom Addition
E6.01 Electrical One-Line Diagram
E6.11 Main Service 12 Month Demand Calculation
E6.12 Panel Schedules - Classroom Addition
E6.13 Panel Schedules - Classroom Addition
E6.14 Panel Schedules - Scene Shop
E6.15 Panel Schedules - Admin
E7.01 Electrical Details
E7.11 Telecom Details
E7.12 Telecom Details
E7.13 Access Control & CCTV Rough-In Details
E7.14 Classroom AV Details
E7.15 Intercom Details
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.