Project #KAS23          Bid Date: 3/16/2021 @ 3:00 pm PDT

Arlington High School Addition and Renovation, Arlington School District, Arlington, WA

Conformed Documents:
Conformed Plans
Conformed Civil Plans
Conformed Survey Plans
Conformed Specs Volume 1
Conformed Specs Volume 2

Bid Documents:

Plans
Survey Plans
Civil Plans
Specs Volume 1
Specs Volume 2
Addendum #1
Addendum #1 Plans
Addendum #2
Addendum #2 Plans
Addendum #3
Addendum #3 Plans
Addendum #3 Civil Plans

Register as a Bidding Subcontractor and be notified of new docs on this project.

Builders Exchange of Washington, Inc. Subs and Suppliers

Bids to:
Kassel & Associates
7126 180th Avenue NE #C103
Redmond, WA 98052
425-828-0236
Fax: 425-828-0381

Contact:
Matt Vernon
mvernon@kasselandassociates.com

Description:
The project consists of the construction of two additions to the existing high school building and the remodel of the existing administration suite to accommodate a new secure entry vestibule. One addition is a two-story classroom building, of approximately 15,000 sf directly adjacent and connected to an existing classroom building. The other addition is a 2,500 sf Scene Shop on the back side of the existing fly-loft for the Performing Arts Center. The renovation of the admin is approximately 3,580 sf.