Wastewater Treatment Plant Mashel River Bank Stabilization, Town of Eatonville, WA
$750,000 to $825,000
Low Bid:
| Bids Received: 5 | ||
| Apparent Low Bid | Active Construction, Inc. | $ 793,793.00 |
| 2nd | DP Excavation | $ 794,810.65 |
| 3rd | Mike McClung Construction Co. | $ 821,476.76 |
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
Town of Eatonville
201 Center Street West
PO Box 309
Eatonville, WA 98328
360-832-3361
Issued by:
www.bxwa.com
Engineer:
Parametrix
1019 39th Ave SE, Suite 100
Puyallup, WA 98374
253-604-6600
Fax: 855-542-6353
Contact: Randy Raymond, PE
rraymond@parametrix.com
Prebid: 5/1 @ 10:00 am on site
Description:
The Wastewater Treatment Plant Mashel River Bank Stabilization provides for the protection of approximately 300 feet of streambank along the right (northerly) bank of the Mashel River. The work includes, but is not limited to, site clearing; furnishing and installing engineered wood structures consisting of toe logs, ballasted log rows, and ballasted engineered log jam (ELJ) structures above and below water; embankment reshaping including furnishing and installing gravel and cobble above and below water; temporary erosion and sediment control; signage; site restoration; planting; fence replacement and other work. All work shall be done in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.