Project #E1693          Bid Date: 7/16/2026 @ 10:00 am PDT

North Boulevard Park Phase 1 - 5th Avenue South Sewer Extension Project, Valley View Sewer District, Tukwila, WA #12540

$1,700,000

Plans
Specs
Addendum #1
Addendum #1 Plans

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
Valley View Sewer District
3460 South 148th Street
Seattle, WA 98168

Issued by:
www.bxwa.com

Engineer:
PACE Engineers, Inc.
11255 Kirkland Way, Suite 300
Kirkland, WA 98033
425-827-2014

Contacts:
Kirk Utley, PE
kutley@paceengrs.com

James Schouten, PE
jamess@paceengrs.com

Prebid: 7/9 @ 10:00 am at the Valley View Sewer District office

Description:
This includes about 1,434 LF of 8-inch sewer mainline pipe, about 400 LF of 6-inch side sewer stub pipe, about 48 LF of 8-inch side sewer stub pipe, sixteen (16) each 8-inch x 6-inch tee and/or wye and five (5) 8-inch x 8-inch tee and/or wye connections for the 6-inch or 8-inch side sewer stub pipe which will extend from the 8-inch mainline pipe to right of way/property line, five (5) each manholes (MH) with the fiberglass (Predl) MH base at each, sawcut and removal of existing asphalt pavement and restoration. The contractor shall support and shore all existing utilities as needed when installing the new sewer pipe below the existing utility. All of this work will be typical open cut type of construction.