This document has 256 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.
Page 1 Cover Page
Page 3 Table of Contents
Page 5 Project Directory
Page 6 Advertisement for Bids
Page 9 Plan Center List
Page 10 Bid Form
Page 12 Contractor Certification Wage Theft Prevention - Responsible Bidder Criteria
Page 13 Division 00 - Supplemental Bidder Responsibility Criteria (Without Inclusion Plan and Apprenticeship Requirements)
Page 15 Form 1 - Contractor Experience Detail
Page 16 Form 2 - Resume of Key Personnel for Proposed Contract
Page 18 Form 5 - Reference Evaluation Questionnaire
Page 19 Form 6 - Supplemental Responsibility Criteria Evaluation Score Sheet
Page 20 Instructions to Bidders / General Conditions
Page 21 Instructions to Bidders
Page 32 Section 007200 General Conditions for Washington State Facility Construction
Page 82 Agenda for Pre-Bid Walk-Through
Page 85 Notice of Nonconformance
Page 86 Section 002113.2 Washington State Prevailing Wage & Davis Bacon Wage Rates
Page 87 Certificate of Liability Insurance
Page 88 Section 007300 Division 00 Special Conditions (Washington State Military Department Supplemental Conditions)
Page 94 Unified Washington Military Department and National Guard Policy No. 10-4
Page 106 Section 803 - Contracts Subject to EEO Clause and Certification
Page 107 Know Your Rights: Workplace Discrimination is Illegal
Page 109 Section 804 - Certification Regarding Lobbying
Page 110 Section 805 - Drug-Free Workplace Requirements Certification
Page 112 Section 806 - Certification Regarding Environmental Protection
Page 113 Section 807 - Certification Regarding Use of United States Flag Vessels
Page 114 Section 808 - Debarment, Suspension, Ineligibility or Voluntary Exclusion Certification
Page 115 Section 809 - Buy American Certification
Page 116 Section 810 - Copeland Anti-Kickback Certification
Page 117 Section 811 - Contract Work Hours and Safety Standards Act Certification
Page 118 Section 812 - System for Award Management (SAM) and Unique Entity Identifier (UEI) Requirement Certification
Page 119 Section 814 - Equal Employment Opportunity Certification
Page 120 Section 815 - Historic Preservation Certification
Page 121 Section 011000 Summary
Page 124 Section 012000 Price and Payment Procedures
Page 127 Section 012000.C Schedule of Values Checklist
Page 128 Instructions for Submittal of Contractor Invoice for Payment
Page 135 Form A19-2AE2 Invoice Voucher
Page 136 Form A19-2AE3 Invoice Voucher
Page 137 Application and Certificate for Payment on Contract
Page 138 Certificate for Material Stored on Job Site
Page 139 Section 012050 Contract Modification Procedures
Page 141 Construction Field Authorization (FA)
Page 142 Section 012600.F Construction Change Directive / Field Authorization
Page 143 Contract Change Order Proposal (COP)
Page 144 Section 012600.F2 Construction Change Directive / Field Authorization
Page 145 Request for Equitable Adjustment in Contract Time
Page 148 Section 012500 Substitution Procedures
Page 151 Substitution Request Form
Page 153 Section 013000 Administrative Requirements
Page 161 Pre-Construction Conference
Page 163 Construction Progress Meeting Agenda
Page 167 Construction Closeout Meeting Agenda
Page 170 Request for Information
Page 171 Required Submittals Schedule
Page 172 Section 013300.C Submittal Checklist
Page 173 Section 013300.F Submittal Transmittal Form
Page 174 Section 013216 Construction Progress Schedule
Page 176 Section 013500 Special Project Procedures for Yakima Training Center
Page 177 The Washington Military Department / Washington Army National Guard Standard Operating Plan and Procedures for the Inadvertent Discovery of Potential Cultural Materials and Human Skeletal Re
Page 182 Section 014000 Quality Requirements
Page 187 Section 014216 Definitions
Page 188 Section 015000 Temporary Facilities and Controls
Page 194 Section 016000 Product Requirements
Page 197 Section 017000 Execution Requirements
Page 203 Section 017419 Construction Waste Management and Disposal
Page 206 Section 017800 Closeout Submittals & Procedures
Page 212 Substantial Completion Checklist
Page 213 Certificate of Substantial Completion
Page 214 Final Completion & Acceptance Checklist
Page 216 Section 023200 Limited Geotechnical Report
Page 221 Section 024119 Selective Demolition
Page 225 Section 312000 Earth Moving
Page 232 Section 312500 Erosion and Sediment Control
Page 233 Section 321210 Surface Sealing
Page 235 Section 321211 Crack and Joint Sealing
Page 237 Section 321216 Asphalt Paving
Page 244 Section 321313 Concrete Paving (Site Walks, Pavements, and Curbs)
Page 254 Section 321723 Pavement Markings