Project #DM43          Bid Date: 10/9/2025 @ 11:00 am PDT

Des Moines Marina Steps, City of Des Moines, WA

$10,000,000

Plans
Geotechnical Plans
Specs - Revised
Pre-Bid Walk Sign-In Sheet
Addendum #1 - Revised
Addendum #1 Plans - Revised
Addendum #1 Geotechnical Plans - Revised
Addendum #2
Addendum #2 Plans
Addendum #3
Addendum #3 Plans

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Des Moines
City Hall
21630 11th Avenue South, Suite C
Des Moines, WA 98198

Contact:
Allyssa Beaver, Project Manager
abeaver@desmoineswa.gov

Issued by:
www.bxwa.com

Prebid: 9/24 @ 10:00 am at the Harbormaster Building, 22307 Dock Ave S, Des Moines, WA 98198

Notes:
Bid Questions live file:
https://shared.outlook.inky.com/link?domain=1drv.ms&t=h.eJxdjUtvgkAURv-KmbVyL84MIyZNDZW60qgLbbsh87iID0oFRUzjf2-ny-6-nC8555td6xMb91hxuXw1Y4DQ1W1QNtCBhdhwbaVzQ0RpMSJIXX3PRNJ2183rIZnO3mn7kp3niZoNbqlJV2ozPawHH9nxbBfF6pme3vbL5bZl_R47-ojpbhoKfaL7xM_AViUI1BqVE9bYXDqeq0hHgiNHGQ5NThZCJUcxKinjAFWoxIh7H3mfNqRbqieOmrLaf1Lz69xVfz3n___88QOo20mS.MEQCIG1k5-JM7C5siSes26EJhnnKqxyuU2sWEpAQ1JUtk__hAiBYR3j_0Tce6hpokYvT1ntNKUTa1NqaT04c6jehEx2Cvg

Description:
The Work includes the redevelopment of the existing Overlook I Park, hillside, areas of the City’s marina floor surface parking lot, improved pedestrian access, and accessible pathways. Site improvements also include undergrounding of existing overhead power on Cliff Avenue South, permanent signage, trench restoration for electrical, pedestrian pathways, playground area, water feature, bioretention planter, storm pipe, underdrains, cleanouts, area drains, trench drains, storm catch basins, water main and associated appurtenances, sanitary sewer and associated fittings, sanitary manholes, ADA parking, MSE wall, retaining wall, overlook weir and wall, concrete stairs, fencing, concrete seat walls, pedestrian barrier and pedestrian railing, asphalt pavement, concrete pavement, irrigation system, illumination system, landscaping, pavement markings, benches, bike racks and other work included in the contract: The Work is to be performed within the number of working days indicated on the bid proposal from the date of Notice to Proceed issued by the Owner and consists of furnishing all materials, equipment, tools, labor, and other work or items incidental thereto for all of the work necessary to complete the Capital Improvements as shown on the drawings and as required for a complete and operating facility as specified in the contract documents.