55th Place West LID Construction Project, City of Mukilteo, WA #SW240202 / Contract #2025-06 - Plans
CV1 Cover Sheet
GN1 Legend & Abbreviations
SV1 Survey Control Plan
SP1 Alignment Control, Site Preparation & TESC Plan
DP1 Stormwater LID Plan
DP2 Stormwater Profiles
DP3 Stormwater Details
DP4 Stormwater Details
MD1 Miscellaneous Details
TC1 Traffic Control Plan
TC2 Traffic Control Plan
AW01 General Notes
AW02 General Notes
AW03 Water Plan & Profile
AW01 Trench Section & Details
Order Prints
Drawing List
FastBid Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.