Project #MUK20          Bid Date: 4/1/2026 @ 2:00 pm PDT

55th Place West LID Construction Project, City of Mukilteo, WA #SW240202 / Contract #2025-06

$750,000 to $800,000

Low Bid:
Bids Received: 11
Apparent Low BidColacurcio Brothers Inc$ 555,848.41
2ndWSB Excavation and Utilities $ 634,333.61
3rdKamins Construction $ 649,979.36

Plans
Specs
Addendum #1
Addendum #2
Bid Tabulation

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Mukilteo
11930 Cyrus Way
Mukilteo, WA 98275
425-263-8000

Contact:
Meiring Borcherds, Surface Water Programs Manager
mborcherds@mukilteowa.gov

Issued by:
www.bxwa.com

Description:
The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for the 55th Pl W LID Construction Project. This project will require retrofitting the existing stormwater system to provide water quality treatment by using low impact development. this work will require the removal and replacement of existing pavement, sidewalk. curb and gutter, and an ADA ramp as well as the removal of existing catch basins and plugging existing pipe. Contractor to implement temporary erosion and sedimentation control measures prior to ground disturbance. The project includes the installation on new type 1 & type 2 catch basins, installation of six biopods and the construction of a new 12-inch stormwater pipeline. Contractor to restore all impacted areas, including landscaped areas, to the pre-disturbed condition. Schedule "B" work for the Alderwood Water & Wastewater District includes removing the existing 8-inch ductile iron water main below the proposed stormwater pipe and tying it into the existing water main system. This work will require removal and replacement of the existing pavement and restoration of the trench in accordance with the contract requirements.