North Line Repair, City of Anacortes, WA #24-166-WTR-002 - Specs

Order Prints   FastBid Help

This document has 604 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Section 000110 Table of Contents
Page 5 Division 00 Procurement and Contracting Requirements
Page 7 Section 000107 Seals and Signatures
Page 9 Section 001113 Invitation to Bid
Page 11 Section 002113 Instructions to Bidders
Page 23 Section 002114 Bidder's Checklist
Page 25 Section 003500 State of Washington Prevailing Wage Requirements
Page 26 Certification of Compliance with Wage Payment Statutes
Page 27 Section 004113 Bid Form
Page 31 Section 004316 Surety Bid Bond Form
Page 33 Section 004400 Information Required of Bidder
Page 39 Section 004410 Proposed Subcontractors
Page 41 Section 005213 Contract
Page 49 Section 006113 Performance Bond
Page 51 Section 006114 Payment Bond
Page 53 Section 006200 Notice of Award Letter
Page 55 Section 006300 Notice to Proceed
Page 57 Section 006400 Notice of Substantial Completion
Page 59 Section 006410 Notice of Final Completion
Page 61 Section 007213 Standard General Conditions
Page 137 Section 007300 Supplementary Conditions to EJCDC Standard General Conditions, C700
Page 153 Division 01 General Requirements
Page 155 Section 011100 Summary of Work
Page 159 Section 011216 Work Sequence
Page 161 Section 012200 Measurement and Payment (Unit Price Contracts)
Page 169 Section 012513 Product Substitutions
Page 173 Section 012973 Schedule of Values
Page 177 Section 012976 Progress Payment Procedures
Page 181 Section 013216 Construction Progress Schedule
Page 187 Section 013300 Submittals
Page 197 Section 013505 Environmental Protection and Special Controls
Page 201 Section 014533 IBC 2018 - Code-Required Special Inspections and Procedures
Page 211 Section 015705 Temporary Controls
Page 221 Section 016200 Product Options
Page 223 Section 017114 Mobilization and Demobilization
Page 225 Section 017133 Protection of the Work and Property
Page 233 Section 017320 Openings and Penetrations in Construction
Page 237 Section 017329 Cutting and Patching
Page 243 Section 017719 Closeout Requirements
Page 253 Section 017823 Operation and Maintenance Data
Page 265 Section 017836 Warranties
Page 269 Section 017839 Project Record Documents
Page 275 Division 02 Existing Conditions
Page 277 Section 020613 Geotechnical Data Report
Page 281 Attachment A Geotechnical Design Memorandum
Page 319 Section 024100 Demolition
Page 325 Division 03 Concrete
Page 327 Section 030005 Concrete
Page 343 Section 031519 Anchorage to Concrete
Page 353 Division 05 Metals
Page 355 Section 055000 Metal Fabrications
Page 371 Division 07 Thermal and Moisture Protection
Page 373 Section 077233 Roof Hatches
Page 377 Division 10 Specialties
Page 379 Section 101400 Identification Devices
Page 389 Division 26 Electrical
Page 391 Section 260500 Electrical - Basic Requirements
Page 397 Section 260519 Wire and Cable - 600 Volt and Below
Page 405 Section 260526 Grounding and Bonding
Page 411 Section 260533 Raceways and Boxes
Page 431 Section 260543 Electrical - Exterior Underground
Page 437 Section 260548 Electrical Seismic Restraint Systems
Page 441 Section 260813 Acceptance Testing
Page 445 Section 260916 Control Equipment Accessories
Page 451 Section 262726 Wiring Devices
Page 455 Section 262800 Overcurrent and Short Circuit Protective Devices
Page 461 Section 262816 Safety Switches
Page 463 Section 264213 Cathodic Protection System
Page 469 Division 31 Earthwork
Page 471 Section 312219 Finish Grading
Page 477 Section 312319 Dewatering
Page 483 Section 312333 Utilities - Trenching and Backfilling
Page 489 Section 312500 Erosion and Sedimentation Controls
Page 495 Division 33 Utilities
Page 497 Section 330515 Precast Concrete Utility Structures
Page 503 Section 330524 Steel Utility Pipe
Page 533 Division 40 Process Interconnections
Page 535 Section 400500 Pipe and Pipe Fittings - Basic Requirements
Page 547 Section 400507 Pipe Support Systems
Page 553 Section 400552 Miscellaneous Valves
Page 557 Section 400564 Butterfly Valves
Page 561 Section 406113 Process Control System General Requirements
Page 569 Section 406121 Process Control System Testing
Page 577 Section 406193 Process Control System Input-Output List
Page 581 Section 406700 Control System Equipment Panels and Racks
Page 593 Section 407006 Schedule of Instrumentation for Process Systems
Page 595 Section 407100 Flow Instrumentation
Page 599 Division 43 Process Gas and Liquid Handling, Purification, and Storage Equipment
Page 601 Section 432104 Sump Pumps