Project #ANC52          Bid Date: 3/25/2026 @ 2:30 pm PDT

2026 Doon Way Waterline Replacements, City of Anacortes, WA #26-093-WTR-001

$1,044,000

Low Bid:
Bids Received: 12
Apparent Low BidRaw Land Construction LLC$ 1,028,192.96
2ndTRICO Companies, LLC$ 1,099,899.33
3rdSummitX Contractors inc.$ 1,144,991.21

Plans
Specs
Addendum #1
Bid Tabulation

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Anacortes
City Clerk
904 6th Street, 2nd Floor
PO Box 547
Anacortes, WA 98221

Contact:
Jeff Beltramini, Project Manager
360-293-1936
jeffb@anacorteswa.gov

Issued by:
www.bxwa.com

Notes:
Bid Opening Information:
Join Zoom Meeting: https://us02web.zoom.us/j/86424546479
Meeting ID: 864 2454 6479

Description:
The work included in this project consists of furnishing all materials, equipment, labor, and incidentals necessary to complete the installation of approximately 4567 linear feet of 8-inch ductile iron water main; 1119 linear feet of 6-inch ductile iron water main; remove and replace fire hydrants; make connections to the existing water system; renew or reconnect existing water services; place hot mix asphalt (HMA); and perform all other work required, all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications.