Pedestrian Improvements & 88th Avenue West Overlay, City of Edmonds, WA #E24CE/i092
$1,000,000
Low Bid:
Bids Received: 7 | ||
Apparent Low Bid | RRJ | $ 943,061.45 |
2nd | Kamins | $ 1,043,868.07 |
3rd | JB Asphalt | $ 1,090,107.75 |
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
City of Edmonds
121 5th Avenue North
Edmonds, WA 98020
425-771-0220
Contact: Ryan Hague
ryan.hague@edmondswa.gov
Issued by:
www.bxwa.com
Notes:
Bid Opening Information: 7/15 @ 2:15 pm
https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZDVkMDE5ZGEtOTA3Mi00OTFmLWI1YjgtOGQyYTI3NThmMGYy%40thread.v2/0?context=%7b%22Tid%22%3a%2247c59576-88c8-4dc3-96c9-73af2bdd3db4%22%2c%22Oid%22%3a%2239e829ac-936f-4c17-823a-586357ee7362%22%7d
Meeting ID: 242 879 969 437 6
Passcode: vE9Uj33m
Description:
This contract provides for maintenance of 88th Ave West from 196th St SW to 185th St SW and pedestrian improvements at various locations in Edmonds. The work includes, but is not limited to: pavement planing and removal, pavement repair, hot mix asphalt paving and walkway repair, curb ramps, minor drainage improvements, utility adjustments, property restoration, temporary erosion and sedimentation control, temporary traffic control and temporary striping, and miscellaneous work.