Project #EDM40          Bid Date: 10/7/2025 @ 2:00 pm PDT

2025 Combined Cured In Place (CIPP) Rehabilitation Project, City of Edmonds, WA #EL4GA/c622 & E24FA/c620

$1,600,000

Low Bid:
Bids Received: 3
Apparent Low BidIronHorse$ 936,879.16
2ndAllied Trenchless$ 1,044,426.88
3rdSCI Infrastructure LLC$ 1,085,855.32

Plans
Specs
Addendum #1
Addendum #1 Plan
Addendum #2
Addendum #3
Bid Tabulation

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Edmonds
121 5th Avenue North
Edmonds, WA 98020
425-771-0220

Contact: Greg Malowicki
greg.malowicki@edmondswa.gov

Issued by:
www.bxwa.com

Notes:
Bid Opening Information:
https://tinyurl.com/3tujzc38
Meeting ID: 271 628 600 677 0
Passcode: zY9Ax6fr

Description:
Construction of the 2025 Combined Cured in Place Pipe (CIPP) Rehabilitation Project and the furnishing of all labor, materials, and equipment necessary for this project. The project covered by these specifications and bid documents involves six schedules (A - Sewer, B - Sewer, C - Sewer, D - Sewer, E – Sewer Bid Alternate, and F - Stormwater) in the construction of the City of Edmonds Phase 12 Sewer and Phase 5 Stormwater Replacement and Rehabilitation Project. This project consists of:

• Phase 12 Sewer (Schedules A – E) Installation of approximately 180 linear feet (LF) of 6-inch diameter cured-in-place pipe (CIPP) structural liner, 3800 LF of 8-inch diameter CIPP structural liner, and 280 LF of 21-inch diameter CIPP structural liner, along with both pre-construction and post-construction CCTV pipe inspection.

• Phase 5 Stormwater (Schedule F) Installation of approximately 910 LF of 24-inch diameter CIPP structural liner, along with preconstruction and post-construction CCTV pipe inspection.