This document has 1283 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.
Page 1 Cover Page
Page 2 Table of Contents
Page 6 Section 00020 Invitation to Bid
Page 9 Section 00100 Instructions to Bidders
Page 23 Section 00200 Checklist of Bidding / Contract Forms
Page 25 Section 00300 Bid Form
Page 35 Bid Deposit
Page 36 Non-Collusion Affidavit
Page 37 Bidders Proposed Project Team
Page 38 Equipment & Manpower Schedule
Page 39 Listing of Proposed Subcontractors - HVAC, Plumbing & Electrical
Page 41 Listing of Proposed Subcontractors - Structural Steel & Rebar Installation
Page 43 Certification Regarding Debarment, Suspension & Other Responsibility Matters
Page 45 Section 00400 Performance & Payment Bond
Page 46 Section 00401 Termination Statement
Page 47 Section 00402 Taxes
Page 48 Section 00403 Prevailing Wages
Page 49 Section 00404 Insurance Requirements
Page 53 Section 00405 Delinquent Taxpayer Statement
Page 54 Section 00406 Mandatory Subcontractor Responsibility Checklist
Page 56 Section 00407 Liquidated Damages Statement
Page 57 Section 00408 Litigation Statement
Page 58 Section 00409 Certification of Compliance with Wage Payment Statutes
Page 59 Section 00500 Agreement
Page 86 Section 00600 Addenda
Page 87 Section 00700 General Conditions
Page 125 Section 00820 Additional Articles - Supplementary Conditions
Page 127 Section 00999a Notice of Award
Page 128 Section 00999b Notice to Proceed
Page 129 Section 00999c Application for Payment
Page 131 Application & Certificate for Payment
Page 132 Section 01000 Professional Responsibilities & Seals
Page 136 Section 01010 Summary of Work
Page 146 Section 01040 Coordination & Project Requirements
Page 156 Section 01140 Environmental Protection
Page 162 Section 01150 Measurement & Payment
Page 168 Section 01190 Structural Design Requirements
Page 176 Section 01300 Submittals
Page 186 Section 01400 Quality Control & Testing
Page 188 Section 01500 Temporary Facilities & Controls
Page 192 Section 01570 Traffic Regulation
Page 194 Section 01650 Facility Startup
Page 198 Section 01700 Contract Closeout
Page 202 Section 01999 Reference Forms
Page 203 Section 01300-A Operation & Maintenance Transmittal Form
Page 204 Section 01300-B Equipment Record Form
Page 205 Section 01650-A Manufacturer's Installation Affidavit Form
Page 206 Section 01650-B Manufacturer's Instruction Certification Form
Page 207 Section 11002-A Motor Data Form
Page 208 Section 16000-A Wire & Cable Continuity / Insulation Resistance Test Data Form
Page 209 Section 16000-B Low-Voltage Motor Test Data Form
Page 210 Section 16000-C Insulation Resistance Test Report Form
Page 211 Section 16000-D Dry Transformer Test Data Form
Page 212 Section 16000-E Low-Voltage Circuit Breaker Test Report Form
Page 213 Section 16000-F Motor Control Center Test Report Form
Page 214 Section 16000-G Transfer Switch Inspection Report Form
Page 215 Section 17000-A Field Switch Calibration Test Data Form
Page 216 Section 17000-B Transmitter Calibration Test Data Form
Page 217 Section 17000-C Miscellaneous Instrument Calibration Test Data Form
Page 218 Section 17000-D Loop Commissioning Test Data Form
Page 219 Request for Information
Page 221 Submittal
Page 223 Proposed Equivalent
Page 226 Section 2050 Demolition
Page 230 Section 02080 Precast Concrete Structures
Page 236 Section 02200 Site Preparation
Page 238 Section 02300 Earthwork
Page 250 Section 02509 Ductile Iron Pipe & Fittings
Page 258 Section 02820 Fences & Gates
Page 266 Section 03100 Concrete Formwork & Formwork Accessories
Page 274 Section 03150 Concrete Joints and Accessories
Page 280 Section 03200 Concrete Reinforcement & Reinforcement Supports
Page 286 Section 03300 Concrete Mixtures, Handling, Placing & Constructing
Page 304 Section 03305 Hot Weather Concreting
Page 308 Section 03306 Cold Weather Concreting
Page 312 Section 03330 Concrete Curing & Protection
Page 318 Section 03340 Hydrostatic Testing of Concrete Structures
Page 322 Section 03350 Concrete Finishing (Structural)
Page 330 Section 03600 Grouts
Page 338 Section 03935 Repair of Defective Concrete
Page 346 Section 05090 Anchors in Concrete
Page 362 Section 05500 Metal Fabrications (Miscellaneous Metal)
Page 372 Section 08307 Access Hatches
Page 376 Section 09960 High Performance Coatings
Page 416 Section 10400 Identifying Devices
Page 422 Section 11001 General Equipment & Mechanical Requirements
Page 432 Section 11003 Disinfection
Page 436 Section 11211 Centrifugal Water Pumps
Page 440 Section 11240 Chemical Feed Equipment
Page 444 Section 11263 On-Site Sodium Hypochlorite Generation System (OSHGS)
Page 446 Section 11304 Submersible Sump Pumps
Page 450 Section 11357 Granular Activated Carbon Vessel Installation
Page 454 Section 13212 Concrete Storage Tanks
Page 464 Section 15050 Piping, Valves & Accessories
Page 486 Section 15060 Pipe Supports
Page 492 Section 15070 Pipe Couplings
Page 498 Section 15080 Piping Insulation & Heat Tracing
Page 504 Section 15111 Gate Valves
Page 508 Section 15113 Butterfly Valves
Page 512 Section 15115 Check Valves
Page 514 Section 15117 Plug Valves
Page 516 Section 15118 Air Valves
Page 518 Section 15119 Globe Style Pilot Controlled Valves
Page 522 Section 16010 General Electrical Requirements
Page 534 Section 16050 Electric Motor Drives
Page 544 Section 16110 Electrical Raceway Systems
Page 552 Section 16120 Low-Voltage Wire & Cable
Page 560 Section 16124 Signal Cable
Page 564 Section 16140 Wiring Devices
Page 568 Section 16155 Motor Starters
Page 572 Section 16160 Panelboards
Page 576 Section 16180 Protective Devices & Switches
Page 578 Section 16280 Surge Protective Devices
Page 580 Section 16402 Underground Electrical Work
Page 586 Section 16450 Electrical Grounding
Page 590 Section 16460 Dry Type Transformers
Page 594 Section 16500 Lighting
Page 598 Section 16950 Electrical Tests
Page 632 Section 16955 Control Devices
Page 636 Section 16961 Power System Studies
Page 642 Section 17000 System Integration
Page 644 Section 17000A Control System Integration - Instrumentation & Control (I&C)
Page 670 Section 17010 PLC Based Control Panel with Application Software (District Supplied)
Page 690 Appendix A Geotechnical Report
Page 790 Appendix B Prepurchase Granular Activated Carbon (GAC) Vessels and Media
Page 893 Appendix C1 GAC Vessels Agreement
Page 902 Appendix C2 SDRL 1, Newterra
Page 1053 Appendix C3 SDRL 2, Newterra
Page 1151 Appendix D1 GAC Media Supply Agreement
Page 1164 Appendix E Onsite Hypochlorite Generation System
Page 1168 Appendix F1 Sodium Hypochlorite Metering Pump
Page 1173 Appendix F2 Ferric Chloride Metering Pump
Page 1177 Appendix G Emerson Rosemont Chlorine Analyzer Panel
Page 1186 Appendix H Construction Stormwater Pollution Prevention Plan