Beach Drive NE Water Main Creek Crossing, North City Water District, Shoreline, WA #CIP 2021-04
$950,000 to $1,250,000
Plans
Specs
Addendum #1
Addendum #2
Register on this project.
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
North City Water District
1519 NE 177th Street
PO Box 55367
Shoreline, WA 98155
Contact: Max Woody
206-366-1842
maxw@northcitywater.org
Issued by:
www.bxwa.com
Description:
The project includes installation of approximately 600 lineal feet of 8-inch, 6-inch and 4- inch Ductile Iron (DI), water main, 535 lineal feet of 10-inch HDPE water main installed via horizontal direction drilling (HDD) under McAleer Creek, connections to the existing system, valves, reestablishing existing services, trenching and backfilling operations, appurtenances, storm sewer system replacements, HMA patching, planing and overlay and associated work. This work is within the City of Lake Forest Park existing Right of Way in Beach Dr NE between 45th Ave NE and the Burke Gilman Trail.