This document has 294 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.
Page 1 Appendix A Standard Details & Water Approved Materials List
Page 33 Appendix B Permits
Page 96 Appendix C Prevailing Wage Rate Requirements and Apprenticeship Utilization Plan
Page 97 Prevailing Wage Rate Requirements
Page 99 Apprenticeship Utilization Plan
Page 101 Appendix D Insurance Requirements
Page 102 Appendix E Construction SWPPP
Page 134 Appendix F Easements
Page 135 Appendix G Geotechnical Reports And/Or Information
Page 136 Geotechnical Engineering Evaluation - Site A Phase 1 - NE 30th Street
Page 240 Geotechnical Engineering Evaluation - Site D Phase 1
Page 270 Appendix H Confined Space
Page 277 Appendix I Correspondence with Property Owners
Page 286 Appendix J Traffic Control Plans
Page 293 Notes