Project #EV39          Bid Date: 5/21/2024 @ 2:00 pm PDT

Reservoir 3 Replacement Phase 1, City of Everett, WA #UP3739

$44,700,000

Volume 1 Specs
Volume 2 Specs
Volume 3 Plans
Pre-Bid Conference Sign-In
Addendum #1
Addendum #1 Plans
Addendum #2
Addendum #2 Plans
Addendum #2 Appendix H Plans
Addendum #3
Addendum #3 Plans
Addendum #4
Addendum #4 Plans
Addendum #5
Addendum #5 Plans

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Everett
2930 Wetmore
Everett, WA 98201

Issued by:
www.bxwa.com

Prebid: 4/18 @ 9:00 am at the project location (the Chlorination building) The time listed in Section 00 25 13 is incorrect.

Notes:
Searchable PDF Links for reference:
· https://www.everettwa.gov/DocumentCenter/View/37994/Reservoir-3-Replacement-Phase-1---Volume-1_R04042024
· https://www.everettwa.gov/DocumentCenter/View/37995/Reservoir-3-Replacement-Phase-1---Volume-2_esh
· https://www.everettwa.gov/DocumentCenter/View/37996/Reservoir-3-Replacement-Phase-1---Volume-3-Drawings-

Description:
The Phase 1 work being performed includes, but is not limited to, furnishing all labor, materials and equipment necessary to construct one 8 million gallon prestressed and partially buried concrete tank, shoring system, dewatering, electrical and instrumentation and control systems, and associated piping and other such appurtenances, including trench and tank excavation, haul, stockpiling and disposal, preparation of a project Health and Safety Plan with related submittals, and performing all Work as required by the Contract. There are also two off-site pipe connections to be built. The Contractor must comply with strict time limitations for construction, which are discussed in the Contract Documents.