Port Gardener Storage Facility - Facility Construction Package, City of Everett, WA #UP-3525 - Volume 7 Attachments    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 1449 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Table of Contents
Page 3 Attachment A Scott Paper Company and Kimberly-Clark As-Built Drawings
Page 86 Attachment B January 2025 Geotechnical Report - Port Gardner Wet Weather Design
Page 607 Attachment C HWA GeoSciences Inc. Concrete Coring & Lab Testing for Structural Evaluation
Page 715 Attachment D Corrosion Probe, Inc. October / November 2022 Condition Assessment
Page 792 Attachment E Floyd Snider Utility Property Cleanup Action Plan Memorandum
Page 824 Attachment F Regulated Building Materials Assessments: Terracon Consultants, Inc. and Lift Station Asbestos / Lead Survey
Page 939 Attachment G City of Everett Solid Waste Facility Permit # PT0005247 (SW-393)
Page 945 Attachment H Prevailing Wage Forms
Page 946 Washington State Prevailing Wage Rates - Snohomish County
Page 992 Benefit Code Key
Page 1010 Attachment I Temporary Electrical System
Page 1042 Attachment J 1000 kVA Diesel Engine Driven Generator Set Manufacturer's Information and Requirements
Page 1153 Attachment K Draft Stormwater Pollution Prevention Plan (SWPPP)
Page 1390 Attachment L Archeological Monitoring and Inadvertent Discovery Plan
Page 1442 Attachment M 2019 Boundary Line Adjustment of Former Kimberly-Clark Worldwide, Inc.
Page 1448 Attachment N Alternative Staging Areas