Project #EV60          Bid Date: 11/18/2025 @ 2:00 pm PST

Water Main Replacement “Y” - Phase 2 (Re-Bid), City of Everett, WA #UP-3814

$2,267,000

Low Bid:
Bids Received: 5
Apparent Low BidInterwest Construction, Inc$ 2,020,202.02
2ndStellar J Construction$ 2,393,578.04
3rdLaser Underground & Earthwork, Inc$ 2,542,668.38

Plans
Specs
Addendum #1
Addendum #2
Bid Results
Bid Tabulation

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Everett
2930 Wetmore
Everett, WA 98201

Issued by:
www.bxwa.com

Description:
The project includes, but is not limited to, furnishing all labor, materials and equipment necessary to construct approximately 1,020 linear feet of 12-inch ductile iron watermain and appurtenances, including relocation of an existing PRV station, site restoration, installation of water main in 18-inch casing on the existing I-5 bridge structure over the Snohomish River and BNSF Railroad, and removal and disposal of the existing 8-inch waterline on the I-5 bridge, and performing all other work as required by the contract.