Port Gardner Storage Facility - West Marine View Drive Storm & Combined Sewer Design - Construction Package 1, City of Everett, WA #UP-3815-01 - Volume 4 Attachments - Part 2    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 638 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Table of Contents
Page 3 Attachment E Prevailing Wage Forms
Page 4 Washington State Prevailing Wage Rates - Snohomish County
Page 51 Benefit Code Key
Page 69 Attachment F Not Used
Page 70 Attachment G MSA Kimberly-Clark Supply Line Evaluation, July 2009
Page 123 Attachment H Draft Stormwater Pollution Prevention Plan (SWPPP)
Page 274 Attachment I Archaeological Monitoring & Inadvertent Discovery Plan
Page 318 Attachment J 2023-090 PGSF WMVD Hazmat Analysis 08/18/25
Page 637 Attachment K CP1 Potential Storage Yards