Project #EV73          Bid Date: 5/19/2026 @ 2:00 pm PDT

Port Gardner Storage Facility - West Marine View Drive Storm & Combined Sewer Design - Construction Package 1, City of Everett, WA #UP-3815-01

$14,247,660

Low Bid:
Bids Received: 8
Apparent Low BidICI Interwest$ 11,637,311.00
2ndScarsella$ 13,064,943.43

Volume 1 Specs
Volume 2 Specs
Volume 3 Plans
Volume 4 Attachments - Part 1
Volume 4 Attachments - Part 2
Pre-Bid Meeting Attendance
Addendum #1
Addendum #2
Addendum #3
Addendum #3 Record Drawings
Addendum #4
Addendum #5
Addendum #6
Bid Results
Bid Tabulation

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Everett
2930 Wetmore
Everett, WA 98201

Issued by:
www.bxwa.com

Prebid: 4/30 @ 1:00 pm

Description:
The project “Port Gardner Storage Facility West Marine View Drive Storm and Combined Sewer – Construction Package 1” consists of construction of various diameter pipelines and structures to convey wastewater and stormwater to the Port Gardner Storage Facility (PGSF) from multiple locations north and south of PGSF. The PGSF will provide temporary combined sewer storage, reducing CSOs at the City’s four remaining uncontrolled CSO discharge points to meet the Washington State Department of Ecology executed Agreed Order number 11638.This facility will also provide stormwater treatment for separated stormwater drainage basins with conveyance to the City’s deepwater outfall and local stormwater conveyance to the Everett Water Pollution Control Facility. This facility is scheduled to be operational by December 31, 2027.