Check Valve Stations - Highlands Temporary Regional Booster Pump Station, City of Kirkland, WA #01-26-PW - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 184 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 General Table of Contents
Page 4 Invitation to Bid
Page 6 General Information, Proposal & Contract
Page 7 Table of Contents - Proposal
Page 8 Information for Bidders
Page 9 Bidder Responsibility Criteria Checklist
Page 11 Subcontractor Responsibility Criteria Checklist
Page 12 Bid Proposal
Page 15 Bid Schedule
Page 16 Bid Deposit
Page 17 Non-Collusion Affidavit
Page 19 Statement of Bidder's Qualifications
Page 20 Subcontractor Identification for Contracts Estimated to be in Excess of One Million Dollars ($1,000,000.00)
Page 21 Subcontractor Identification List
Page 22 Bidder's Checklist
Page 23 Contract
Page 24 Table of Contents - Contract Documents
Page 25 Public Works Agreement
Page 27 Performance Bond
Page 28 Labor, Material & Taxes Payment Bond
Page 30 Contractor's Declaration of Option for Management of Statutory Retained Percentage
Page 31 Retainage Bond
Page 32 Retained Percentage Escrow Agreement
Page 35 Retainage Release Requirements
Page 36 General Special Provisions
Page 37 Table of Contents - General Special Provisions
Page 38 GSP Division 1
Page 39 Special Provisions
Page 40 Table of Contents - Special Provisions
Page 43 Introduction
Page 45 Division 1 General Requirements
Page 102 Table of Contents
Page 104 GSP Division 2
Page 105 Division 2 Earthwork
Page 109 GSP Division 5
Page 110 Division 5 Surface Treatments & Pavements
Page 138 GSP Division 7
Page 139 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 143 GSP Division 8
Page 144 Division 8 Miscellaneous Construction
Page 150 GSP Division 9
Page 151 Division 9 Materials
Page 157 GSP Division 10
Page 158 Division 10 Measurement & Payment (New Section)
Page 164 Prevailing Wages
Page 166 Appendix A Plans
Page 181 Appendix B Geotechnical Memorandum