Project #KRK89          Bid Date: 3/16/2026 @ 2:00 pm PDT

Check Valve Stations - Highlands Temporary Regional Booster Pump Station, City of Kirkland, WA #01-26-PW

$425,000 to $475,000

Plans
Specs

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Kirkland
123 5th Avenue
Kirkland, WA 98033

Contact: Nick Sondergaard
NSondergaard@kirklandwa.gov

Issued by:
www.bxwa.com

Description:
The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for construction of the Check Valve Stations – Highlands Temporary Regional Booster Pump Station. The project includes the construction of two check valve stations on separate sites along 116th Ave NE. Specific work includes, but is not limited to, relocation of existing utilities, construction of water main to facilitate connection to new check valve stations, connections to existing water mains, installation of City provided vaults, installation of mechanical piping and valving within the vaults, trenching, backfill and temporary surface restoration.