2026 Annual Replacement of Aging and Failing Infrastructure, City of Kirkland, WA #06-26-PW - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 337 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 5 General Table of Contents
Page 7 Invitation to Bid
Page 11 General Information, Proposal & Contract
Page 13 Table of Contents - Proposal
Page 14 Information For Bidders
Page 15 Bidder Responsibility Criteria Checklist
Page 16 Supplemental Bidder Responsibility Criteria Checklist
Page 17 Subcontractor Responsibility Criteria Checklist
Page 18 Bid Proposal
Page 20 Bid Schedule
Page 22 Bid Deposit
Page 23 Non-Collusion Affidavit
Page 24 Statement of Bidder's Qualifications
Page 26 Subcontractor Identification for Contracts Estimated to be in Excess of One Million Dollars ($1,000,00.00)
Page 27 Subcontractor Identification List
Page 28 Bidder's Checklist
Page 29 Contract
Page 31 Table of Contents - Contract Documents
Page 33 Public Works Agreement
Page 35 Performance Bond
Page 36 Labor, Material & Taxes Payment Bond
Page 38 Contractor's Declaration of Option for Management of Statutory Retained Percentage
Page 39 Retainage Bond
Page 40 Retained Percentage Escrow Agreement
Page 43 Retainage Release Requirements
Page 45 General Special Provisions
Page 47 Table of Contents - Special Provisions
Page 49 GSP Division 1
Page 51 Special Provisions
Page 52 Table of Contents - Special Provisions
Page 55 Introduction
Page 57 Division 1 General Requirements
Page 123 GSP Division 2
Page 125 Division 2 Temporary Features
Page 131 GSP Division 3
Page 133 Division 3 Earthwork
Page 137 GSP Division 4
Page 139 Division 4 Aggregates & Bases
Page 141 GSP Division 5
Page 143 Division 5 Surface Treatments & Pavements
Page 169 GSP Division 6
Page 171 Division 6 Structures
Page 173 GSP Division 7
Page 175 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 197 GSP Division 8
Page 199 Division 8 Miscellaneous Construction
Page 209 GSP Division 9
Page 211 Division 9 Materials
Page 213 Prevailing Wages
Page 217 Appendix A Plans
Page 259 Appendix B Permits
Page 287 Appendix C CCTV Records
Page 331 Appendix D Easements
Page 335 Appendix E Pipe Capacity for Storm Drain Bypassing