Lift Station No. 4 Relocation, City of Lynnwood, WA #3587
$6,500,000 to $7,500,000
Low Bid:
| Bids Received: 5 | ||
| Apparent Low Bid | McClure and Sons, Inc | $ 6,141,027.17 |
| 2nd | Strider Construction Co., Inc. | $ 6,378,656.80 |
| 3rd | Faber Construction Corporation | $ 6,506,649.76 |
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
City of Lynnwood
19100 44th Avenue West
Lynnwood, WA 98036
https://procurement.opengov.com/portal/lynnwoodwa?status=all
Contact: Erin Duleba
eduleba@lynnwoodwa.gov
Issued by:
www.bxwa.com
Prebid: 6/12 @ 10:00 am at 18119 26th Ave W, Lynnwood WA 98037
Notes:
Pre-Bid Walk-Through Meeting Location: https://maps.app.goo.gl/NzYm1kXmiy1PWFYB9
Description:
Construction of a new lift station (LS) nearby the existing Lift Station No. 4 (LS4). The work includes the following:
- New pump station with three (3) pumps, a wet well, and other structures
- New concrete masonry unit operations building
- New gravity sewer and manholes
- New discharge force mains