44th Avenue West Underpass Pedestrian and Bicycle Improvement, City of Lynnwood, WA #2938 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 625 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Contract Documents
Page 5 Section 1 Invitation for Bids
Page 11 Section 2 Bidder's Checklist
Page 15 Section 3 Bid Proposal Form
Page 17 Bid Cover Sheet
Page 18 Bid for Project
Page 26 Addenda Received
Page 27 Bid Security
Page 28 Responsible Bidder Determination Form
Page 29 Responsible Subcontractor Determination Form
Page 30 Statement of Bidder's Qualifications
Page 32 Non-Collusion Declaration
Page 34 Contractor Certification / Wage Law Compliance - Responsibility Criteria
Page 35 Local Agency Subcontractor List
Page 36 Local Agency Certification for Federal-Aid Contracts
Page 37 Bidder Questionnaire
Page 39 Delinquent State Taxes
Page 40 Claims Against Retainage & Bonds
Page 41 Public Bidding Chimes
Page 42 Termination for Cause / Termination for Default
Page 43 Lawsuits
Page 44 Section 4 Contract
Page 50 Section 5 Performance & Indemnity Bond, Labor & Materials Bond & Insurance Certificate
Page 52 Performance Bond
Page 54 Payment Bond
Page 56 Certificate of Liability Insurance
Page 58 Section 6 State Prevailing Wage Rates Federal Prevailing Wage Rates
Page 60 Washington State Prevailing Wage Rates - Snohomish County
Page 93 Benefit Code Key
Page 111 Federal Wage Rate
Page 165 Section 7 Required Contract Provisions Federal Aid Construction Contracts
Page 181 Section 8 Special Provisions
Page 183 Table of Contents
Page 185 Introduction to the Special Provisions
Page 186 Division 1 General Requirements
Page 252 Division 2 Temporary Features
Page 264 Division 3 Earthwork
Page 270 Division 4 Aggregates & Bases
Page 271 Division 5 Surface Treatments & Pavement
Page 298 Division 6 Structures
Page 305 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 312 Division 8 Miscellaneous Construction
Page 367 Division 9 Materials
Page 389 Section 9 Contract Plans (Under Separate Cover)
Page 391 Section 10 Standard Plans
Page 481 Appendix A Geotechnical Report
Page 562 Appendix B Copies of Permits