Project #E1380          Bid Date: 3/3/2026 @ 10:00 am PST

Cast Iron Main Replacement Phase 2, Silver Lake Water & Sewer District, Snohomish County, WA #24-0003

$4,332,000

Low Bid:
Bids Received: 9
Apparent Low BidShoreline Construction $ 3,244,068.22
2ndEarthwork Solutions$ 3,448,654.26
3rdKar-Vel Construction $ 3,513,333.39

Plans
Specs
Bid Tabulation

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
Silver Lake Water & Sewer District
15205 41st Avenue SE
Bothell, WA, 98012
425-337-3647
proposals@slwsd.com

Contact:
Hawk Radosevich
425-287-8222
hradosevich@slwsd.com

Issued by:
www.bxwa.com

Description:
The work to be performed for this project consists of water improvements. Water main improvements include but are not limited to construction of approximately 1,340 linear feet of new 12-inch diameter DI water main, approximately 4,060 linear feet of new 8-inch diameter DI water main, approximately 60 linear feet of new 6-inch diameter DI water main, isolation valving, 116 water service connections, 11 fire hydrants, 5 combination air release/vacuum valve assemblies, 19 connections to existing water main, removal, haul, and disposal of approximately 660 linear feet of existing 4-, 6-, 8-, and 10-inch diameter water main, and abandonment of existing 4-, 6-, and 8-inch diameter water main. Additional work includes temporary and permanent trench patching, a 2-inch grind and overlay, channelization, restoration, temporary erosion control, and traffic control.