Cast Iron Water Main Replacement Project Phase 1 - Evergreen Ridge, Silver Lake Water & Sewer District, Snohomish County, WA #24-0002 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 387 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Table of Contents
Page 3 Part I Call for Bids
Page 6 Part II Instructions to Bidders
Page 14 Part III Bid Documents
Page 15 Bid Submittal Checklist
Page 16 Bid Proposal
Page 20 Bidder Responsibility Criteria
Page 22 Statement of Bidder's Qualifications
Page 24 Non-Collusion Declaration
Page 25 Bid Bond
Page 26 Subcontractor List
Page 28 Part IV Award Documents
Page 29 Contract Agreement
Page 31 Public Works Payment Bond
Page 32 Performance Bond
Page 33 Declaration of Option for Management of Statutory Retained Percentage
Page 35 Part V General Conditions
Page 75 Part VI Project Special Provisions
Page 77 Table of Contents
Page 84 Introduction to the Special Provisions
Page 85 Division 1 General Requirements
Page 100 Division 2 Temporary Features
Page 101 Division 3 Earthwork
Page 112 Division 4 Aggregates & Bases
Page 114 Division 5 Surface Treatments & Payments
Page 140 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 162 Division 8 Miscellaneous Construction
Page 172 Division 9 Materials Section
Page 178 Appendix A Geotechnical Investigation Information
Page 197 Appendix B Snohomish County Issued Permits
Page 213 Appendix C Example Traffic Control Plans
Page 225 Appendix D Monument Documentation
Page 236 Appendix E Inadvertent Discovery Plan
Page 247 Appendix F District Code 6.20, Article II. Water Systems (SLWSD Water Standards)
Page 262 Appendix G Stormwater Pollution Prevention Plan (SWPPP)