Cast Iron Water Main Replacement Project Phase 1 - Evergreen Ridge, Silver Lake Water & Sewer District, Snohomish County, WA #24-0002
$2,000,000 to $2,600,000
Low Bid:
| Bids Received: 8 | ||
| Apparent Low Bid | Shoreline Construction Co. | $ 1,983,829.71 |
| 2nd | Earthwork Solutions | $ 2,047,608.39 |
| 3rd | Kar-Vel Construction | $ 2,092,209.21 |
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
Silver Lake Water & Sewer District
15205 41st Avenue SE
Bothell, WA, 98012
425-337-3647
proposals@slwsd.com
Contact:
Hawk Radosevich
425-287-8222
hradosevich@slwsd.com
Issued by:
www.bxwa.com
Description:
The work to be performed for this project consists of removing and disposing of cast iron and ductile iron pipe water mains; installing 6-inch and 8-inch diameter ductile iron pipe water main; removing valves and installing gate valves; removing and replacing service lines; removing and replacing hydrants; permitting; construction survey and staking; project temporary traffic control; construction sequencing; temporary water pollution and erosion prevention; utility potholing; removing and replacing road pavement; pavement planning and asphalt overlay: concrete sidewalk, curb ramp and driveway replacements; adjustment of utility cover(s); channelization; restoring the site including property restoration; and other related work.