Project #TSD35          Bid Date: 2/13/2025 @ 2:30 pm PST

Black Hills High School Hydronic Pipe Fittings 2025, Tumwater School District, Tumwater, WA

$485,000

Low Bid:
Bids Received: 2
Apparent Low BidJA Morris Construction $ 648,000.00
2ndApex Mechanical LLC$ 698,000.00

Plans
Specs
Addendum #1
Bid Tabulation

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
Tumwater School District
Capital Projects Office
621 Linwood Avenue SW
Tumwater, WA 98512

Issued by:
www.bxwa.com

Architect:
Tovani Hart, PC
609 A Columbia St. SW
Olympia, WA 98501
360-339-8274
Fax 360-350-5614

Prebid: 1/30 @ 2:30 pm at Black Hills High School

Description:
The project includes replacement of heating water fittings and some sections of piping. Chilled water piping and fittings will remain. Sections of the existing acoustical panel and gypsum board ceilings will be removed and replaced or repaired to provide access to piping and fittings. Insulation removed to access piping and fittings will need to be replaced. Some EMS control devices require replacement and there will be some new raceway and conductors required to connect to existing controllers.