Water Street Sewer Replacement, City of Port Townsend, WA
$1,900,000 to $2,250,000
Low Bid:
Bids Received: 2 | ||
Apparent Low Bid | Active Construction, Inc. | $ 2,360,360.00 |
2nd | Rognlin's, Inc. | $ 3,774,300.00 |
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
City of Port Townsend
City Hall
250 Madison St, Suite 1
Port Townsend, WA 98368
Contact: Andre Harper
aharper@cityofpt.us
Issued by:
www.bxwa.com
Engineer:
RH2 Engineering, Inc.
22722 29th Drive SE, Suite 210
Bothell, WA 98021
425-439-4008
Description:
The project includes extending the City’s existing Monroe Lift Station force main by approximately 1,850 linear feet via horizontal directional drilling and open-cut and replacing approximately 1,830 linear feet of existing gravity sewer main via sliplining along Water Street. The work also includes traffic control, temporary sewer bypasses, manhole rehabilitations, side sewer reinstatements, abandonment, restoration, and coordination with the City for construction sequencing.
Photos of the sewer manholes being rehabilitated as part of this project are accessible through the website below.
https://rh2engineeringinc.sharepoint.com/:f:/s/rh2filesharing/EhWHI8_5QRFKtyCeuIN6YxsBSDVacse8CEsOLZ_5-JP_fQ?e=37X3J4