Tyler Street Overlay, City of Port Townsend, WA
Low Bid:
Bids Received: 6 | ||
Apparent Low Bid | Northern Asphalt | $ 463,635.25 |
2nd | Agate Asphalt | $ 534,415.25 |
3rd | Lakeside Industries, Inc. | $ 536,091.75 |
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
City of Port Townsend
City Hall
250 Madison St, Suite 1
Port Townsend, WA 98368
Contact:
Laura Parsons, PE
lparsons@cityofpt.us
Issued by:
www.bxwa.com
Description:
The Tyler Street Overlay project includes the following work: full-depth-reclamation (FDR) of travel lanes, add cement treatment to the travel lanes FDR, and pave the travel lanes FDR with HMA asphalt; reshape the FDR of the shoulders and pave the shoulders with HMA asphalt; remove existing sidewalk, curb ramps, and curbs; construct curb ramps and sidewalk, and furnish and install detectable warning strips; and furnish and install pavement markings. The work will also include traffic control, temporary pedestrian route maintenance, and coordination with the City for construction sequencing.