Project #PT36          Bid Date: 3/6/2025 @ 3:00 pm PST

Tyler Street Overlay, City of Port Townsend, WA

Low Bid:
Bids Received: 6
Apparent Low BidNorthern Asphalt$ 463,635.25
2ndAgate Asphalt$ 534,415.25
3rdLakeside Industries, Inc.$ 536,091.75

Plans
Specs
Addendum #1
Addendum #1 Plans
Addendum #2
Preliminary Bid Results
Bid Tabulation

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Port Townsend
City Hall
250 Madison St, Suite 1
Port Townsend, WA 98368

Contact:
Laura Parsons, PE
lparsons@cityofpt.us

Issued by:
www.bxwa.com

Description:
The Tyler Street Overlay project includes the following work: full-depth-reclamation (FDR) of travel lanes, add cement treatment to the travel lanes FDR, and pave the travel lanes FDR with HMA asphalt; reshape the FDR of the shoulders and pave the shoulders with HMA asphalt; remove existing sidewalk, curb ramps, and curbs; construct curb ramps and sidewalk, and furnish and install detectable warning strips; and furnish and install pavement markings. The work will also include traffic control, temporary pedestrian route maintenance, and coordination with the City for construction sequencing.