Page 1 Cover Page
Page 3 Contract Provisions
Page 5 Table of Contents
Page 7 Call for Bids
Page 11 Professional of Record Certification(s)
Page 15 Information and Checklist for Bidders
Page 17 Information for Bidders
Page 25 Checklist for Bidders
Page 29 Summary of Fair Practices Policy
Page 31 Summary of American Disabilities Act Policy
Page 33 Contract Provisions for Obligated Sponsors and Airport Improvement Program Projects
Page 77 Project Proposal Cover
Page 79 Proposal
Page 81 Schedule of Prices
Page 97 Non-Collusion Declaration
Page 99 Certification of Non-Segregated Facilities
Page 101 Bidder's Statement on Previous Contracts Subject to EEO Clause
Page 103 Disadvantaged Business Enterprise Utilization Commitment
Page 105 Letter of Intent - Award Alternative #1
Page 107 Letter of Intent - Award Alternative #2
Page 109 Letter of Intent - Award Alternative #3
Page 111 Restrictions on Federal Public Works Projects
Page 113 Bidder's Certification
Page 115 Buy America Certification
Page 119 Bidders List
Page 121 Subcontractor List
Page 123 Proposal for Incorporating Recycled Materials into the Project
Page 125 Contractor Certification / Wage Law Compliance - Responsibility Criteria
Page 127 Proposal Signature Page
Page 129 Proposal Bid Bond to the City of Renton
Page 131 Agreement Forms
Page 133 Agreement
Page 135 Contract Bond to the City of Renton
Page 137 Contract Specifications
Page 139 Table of Contents
Page 141 Section 10 Definition of Terms
Page 149 Section 20 Proposal Requirements and Conditions
Page 153 Section 30 Award and Execution of Contract
Page 155 Section 40 Scope of Work
Page 159 Section 50 Control of Work
Page 165 Section 60 Control of Materials
Page 169 Section 70 Legal Regulations and Responsibility to Public
Page 175 Section 80 Execution and Progress
Page 183 Section 90 Measurement and Payment
Page 191 Supplementary Conditions
Page 201 Item C-100 Contractor Quality Control Program (CQCP)
Page 209 Section C-101 FOD Prevention Controls
Page 211 Item C-102 Temporary Air and Water Pollution, Soil Erosion, and Siltation Control
Page 223 Item C-103 Airport Safety
Page 231 Item C-105 Mobilization
Page 233 Item C-106 Temporary Traffic Control
Page 239 Item C-110 Method of Estimating Percentage of Material Within Specification Limits (PWL)
Page 245 Section C-140 Construction Staking
Page 249 Item P-101 Preparation / Removal of Existing Pavements
Page 255 Item P-102 Trench Excavation Safety Systems
Page 257 Item P-103 Utility Potholing
Page 259 Item P-152 Excavation, Subgrade, and Embankment
Page 269 Item P-153 Controlled Low-Strength Material (CLSM)
Page 273 Item P-209 Crushed Aggregate Base Course
Page 281 Section P-311 Biaxial Geogrid
Page 285 Item P-401 Asphalt Mix Pavement
Page 305 Item P-403 Asphalt Mix Pavement Base Course
Page 323 Item P-405 Water Main Hot Mix (HMA) Pavement
Page 347 Item P-502 Cement Concrete Sidewalks
Page 349 Item P-503 Curbs and Gutters
Page 351 Item P-603 Emulsified Asphalt Tack Coat
Page 355 Item P-605 Joint Sealants for Pavements
Page 359 Item P-606 Adhesive Compounds, Two-Component for Sealing Wire and Lights in Pavement
Page 363 Item P-610 Concrete for Miscellaneous Structures
Page 375 Item P-620 Runway and Taxiway Marking
Page 381 Item P-625 Right-of-Way Pavement Markings
Page 385 Item D-701 Pipe for Storm Drains and Culverts - Addendum 1
Page 391 Item D-705 Pipe Underdrains for Airports
Page 397 Item D-751 Manholes, Catch Basins, Inlets and Inspection Holes
Page 403 Item L-100 Electrical General Requirements
Page 417 Item L-108 Underground Power Cable for Airports
Page 429 Item L-109 Airport Transformer Vault and Vault Equipment
Page 441 Item L-110 Airport Underground Electrical Duct Banks and Conduits
Page 451 Item L-115 Electrical Manholes and Junction Structures
Page 459 Item L-125 Installation of Airport Lighting Systems
Page 465 Item T-901 Seeding
Page 471 Item T-905 Topsoil
Page 475 Item W-100 Water Mains
Page 489 Item W-101 Valves for Water Mains
Page 493 Item W-102 Hydrants
Page 497 Item W-103 Compressed Air
Page 501 Appendix A Construction Safety and Phasing Plan
Page 537 Appendix B Davis Bacon Wage Rate Schedule
Page 583 Washington State Prevailing Wage Rates - King County
Page 631 Benefit Code Key
Page 649 Appendix D Buy American Conformance Listing
Page 653 Appendix E Buy American Waiver Request Forms
Page 655 FAA Form 5100-136, Buy American Project / Product Content Percentage Calculation - Worksheet
Page 659 Buy American Project / Product Content Percentage Calculation - Worksheet
Page 667 FAA Form 5100-137, Buy American Preferences - Final Assembly Questionnaire
Page 669 FAA Form 5100-143, FAA Buy American Preference Construction Project Content Percentage Worksheet
Page 673 FAA Buy American Preference Construction Project Content Percentage Worksheet
Page 675 Appendix F DBE Good Faith Efforts
Page 681 Appendix G Inadvertent Discovery Plan
Page 701 Appendix H Hazardous Waste Mitigation Plan