Highlands Reservoir Water Main Improvements Project, City of Renton, WA #CAG-26-001
$8,000,000 to $9,000,000
Low Bid:
| Bids Received: 10 | ||
| Apparent Low Bid | Earthwork Solutions, LLC | $ 6,567,108.39 |
| 2nd | Fury Site Works Inc. | $ 7,441,169.95 |
| 3rd | Raudenbush Earthworks | $ 7,684,150.13 |
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
City of Renton
1055 South Grady Way
Renton WA 98055
425-430-7200
http://rentonwa.gov/bids/
Contact: Ken Srilofung
425-430-7247
ksrilofung@rentonwa.gov
Issued by:
www.bxwa.com
Notes:
Pre-Bid Meeting Information: 3/16 @ 10:00 am via Microsoft Teams
- https://teams.microsoft.com/meet/24952894058931?p=vfs4hWnINTyaEwyV53
- Meeting ID 249 528 940 589 31; Passcode: fT3LD9kM
- Via Telephone by dialing: +1 425-655-2231,,271949195#
- Phone conference ID: 271 949 195#
Bid Opening Information:
- https://us06web.zoom.us/j/82746295265?pwd=VWjA0uEKB5bU6xxJb5ibTqQvrOMZWG.1
- Using the Zoom app: Meeting ID: 827 4629 5265; Passcode: 116574
- Via telephone by dialing: 12532158782,,82746295265#,,,,*116574#
Description:
The Highlands Reservoir Water Main Improvements Project consists of:
- Installation of approximately 5,400 linear feet of 6-inch to 16-inch restrained-joint ductile iron water main and appurtenance, including 69 gate and butterfly valves, 8 fire hydrants, 35 water service lines, 34 connections to existing water mains, and the in-place abandonment, removals and disposals of existing water system and asbestos cement pipes.
- Installation of approximately 1,600 linear feet of 8-inch to 18-inch storm pipes, along with 18 storm catch basins and manholes.
- Restoration of surface conditions including asphalt trench patching, asphalt overlay, and reconstruction of concrete curbs, gutters, and sidewalks.
- Implementation of traffic control, erosion and sedimentation control measures, and trench safety systems.
- Other work as necessary to complete the project.