Rainier Ave South Stormwater Pump Station Upgrade Project, City of Renton, WA #CAG-26-069 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 543 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Table of Contents
Page 5 Call for Bids
Page 8 Information for Bidders
Page 9 Information & Checklist for Bidders
Page 14 Vicinity Map
Page 16 Summary of Fair Practices Policy
Page 17 Summary of Americans with Disabilities Act Policy
Page 18 Project Proposal
Page 19 Acknowledgement of Receipt of Addenda
Page 20 Proposal Page
Page 21 Schedule of Prices
Page 23 Combined Affidavit & Certificate Form
Page 24 Subcontractor List
Page 26 Certification of Compliance with Wage Payment Statutes
Page 27 Department of Labor & Industries Certificate of Registration
Page 28 Proposal Signature Page
Page 31 Proposal Bid Bond to the City of Renton
Page 33 Agreement Forms
Page 34 Agreement
Page 36 Contract Bond to the City of Renton
Page 38 Fair Practices Policy Affidavit O Compliance
Page 39 Retainage Selection
Page 40 Contract Specifications
Page 41 Table of Contents
Page 54 Introduction to the Special Provisions
Page 55 Division 1 General Requirements
Page 130 Division 2 Earthwork
Page 136 Division 5 Surface Treatment & Payments
Page 172 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 238 Division 8 Miscellaneous Construction
Page 256 Division 9 Materials
Page 281 Technical Specifications
Page 283 Table of Contents
Page 288 Division 1 General
Page 295 Division 2 Sitework
Page 303 Division 3 Concrete
Page 323 Division 4 Masonry (Not Used This Contract)
Page 324 Division 5 Metals (Not Used This Contract)
Page 325 Division 6 Wood, Plastics & Composites (Not Used This Contract)
Page 326 Division 7 Thermal & Moisture Protection (Not Used This Contract)
Page 327 Division 8 Openings
Page 333 Division 9 Finishes
Page 341 Division 10 Specialties (Not Used This Contract)
Page 342 Division 11 Equipment
Page 352 Division 12 Furnishings (Not Used This Contract)
Page 353 Division 13 Special Construction (Not Used This Contract)
Page 354 Division 14 Conveying Systems
Page 358 Division 15 Mechanical
Page 368 Division 16 Electrical
Page 433 Division 17 Automatic Control
Page 456 Appendices
Page 457 Appendix A Standard Plans & Details
Page 469 Appendix B Prevailing Wage Rate References
Page 471 Appendix C City of Renton Insurance Requirements
Page 474 Appendix D Traffic Control Information
Page 484 Appendix E Geotechnical Report - for Reference Only
Page 543 Volume 2 Plans (Under Separate Cover)