Project #REN88          Bid Date: 4/23/2026 @ 12:00 pm PDT

Rainier Ave South Stormwater Pump Station Upgrade Project, City of Renton, WA #CAG-26-069

$1,400,000 to $1,710,000

Call for Bids
Plans
Specs
Addendum #1
Addendum #1 Plans

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Renton
1055 South Grady Way
Renton WA 98055
425-430-7200

Contact: Casey Jeszeck
425-430-7323
cjeszeck@rentonwa.gov

Issued by:
www.bxwa.com

Notes:
Bid Opening Meeting Information:
https://us06web.zoom.us/j/83971661991?pwd=UEY4byVbJPDpfBKjGWfuPN5staImmq.1
Meeting ID: 839 7166 1991
Password: 089336

Description:
The City of Renton Surface Water Utility is seeking bid submittals from contractors interested in constructing the Rainier Ave South Stormwater Pump Station Upgrade Project. The work involved under the terms of this contract document shall be full and complete installation of the facilities, as shown on the plans and as described in the construction specifications, to include but not be limited to:
- Construction surveying, staking, and production of as-built plans.
- Installing and maintaining adequate TESC measures and restoring all disturbed areas.
- Temporary traffic control measures in accordance with the contract documents and applicable City of Renton and MUTCD standards.
- Installation of 60-kW natural gas emergency generator and supporting power and telemetry panels.
- Approximately 205 lineal feet of retaining wall and footing drain connection with existing storm system.
- Concrete site work including concrete stairs and pedestal to support new generator and equipment.
- Two new stormwater pumps, discharge pipes and gate valves.
- Maintenance improvements to existing pump house including hoist monorail and winch system, new door opening, and enlarged floor grate.
- Trench excavation, including removal of existing unsuitable material, and disposal of excavated material.
- Removal of sidewalk, curb and gutter, and site work associated with the pump station upgrades.