2025 Stormwater Pipe Repair and Small Drainage Projects, City of Shoreline, WA #1202802 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 318 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Table of Contents
Page 3 Section I Notice of Call for Bids
Page 5 Section II General Terms & Conditions & Instructions to Bidders & Bidder's Checklist
Page 12 Section III Bid Documents
Page 13 Bid Proposal Form
Page 20 Signature(s) & Declarations
Page 21 Bid Proposal Bond
Page 22 Contractor Certification of Wage Law Compliance
Page 23 Local Agency Subcontractor List
Page 24 Statement of Bidder Responsibility
Page 26 Section IV Award Documents
Page 27 Agreement (Sample)
Page 30 Contract Bond
Page 31 Retainage Instructions - Mandatory Form
Page 32 Retainage Bond
Page 33 Section V Special Provisions
Page 34 Table of Contents - Special Provisions
Page 41 Introduction to the Special Provisions
Page 42 Division 1 General Requirements
Page 104 Division 2 Earthwork
Page 110 Division 4 Bases
Page 113 Division 5 Surface Treatments & Pavements
Page 139 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 148 Division 8 Miscellaneous Construction
Page 162 Division 9 Materials
Page 165 Section VI Plans (Under Separate Cover)
Page 166 Section VII Appendices
Page 168 Appendix A Wage Rates
Page 170 Appendix B Project Permits
Page 186 Appendix C Construction Forms
Page 187 Request to Subcontract Work
Page 188 Request for Approval of Material
Page 189 Request for Information
Page 190 Contractor Change Order Request
Page 191 Material Substitution Request
Page 192 Transmittal for Non-Material Submittals
Page 193 Appendix D Summary of Geotechnical Conditions
Page 252 Appendix E City of Shoreline & WSDOT Standard Plans
Page 289 Appendix F Draft Stormwater Pollution Prevention Plans (Open-Cut Sites)