Project #STN44          Bid Date: 3/3/2026 @ 2:00 pm PST

272nd Street NW 72nd Ave NW Sidewalk Improvements, City of Stanwood, WA

$700,000 to $800,000

Advertisement for Bids
Plans
Specs
Addendum #1
Addendum #2

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Stanwood
10220 270th Street NW
Stanwood, WA 98292

Contact: Alan Lytton
360-502-1326
Alan.Lytton@ci.stanwood.wa.us

Issued by:
www.bxwa.com

Description:
The 272nd ST NW 72nd Ave NW Sidewalk Improvement project consists of Curb, gutter, planter strip and sidewalk with storm drainage and treatment along 272nd St NW from 78th Ave NW east to 72nd Ave NW and then north along the west side of 72nd Ave NW to end of the current sidewalk south of Tyler Pl NW and along the north side of 272nd St NW from the end of the existing sidewalk opposite 78th Ave NW east to the west entrance of the parking lot of the Bob Larson Stadium. The project also includes 12” C900 water main connecting existing system on 72nd to existing system on 272nd.