This document has 1070 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.
Page 1 Invitation to Bid
Page 5 Special Provisions
Page 6 Certification
Page 8 Introduction to the Special Provisions
Page 9 Division 1 General Requirements
Page 60 Division 2 Earthwork
Page 74 Division 3 Aggregate Production and Acceptance
Page 77 Division 4 Bases
Page 78 Division 5 Surface Treatments and Pavements
Page 107 Division 6 Structures
Page 112 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains, and Conduits
Page 119 Division 8 Miscellaneous Construction
Page 144 Division 9 Materials
Page 152 Appendices
Page 153 Standard Plans
Page 162 Appendix A Final Geotechnical Report
Page 258 Appendix B King County Prevailing Wage Rates
Page 260 Appendix C Standard Plans
Page 261 Woodinville Standard Plans
Page 268 King County Standard Plans
Page 273 Woodinville Water District Standard Plans
Page 283 WSDOT Standard Plans
Page 328 Appendix D Permits
Page 387 Appendix E Utility Relocation Plans
Page 423 Appendix F Final Stormwater Drainage Report
Page 826 Appendix G Illumination Technical Memorandum
Page 856 Appendix H Pedestrian Tunnel Shop Drawings
Page 1037 Bid Proposal Form
Page 1040 Bid Bond Form
Page 1042 Bid Proposal Instructions
Page 1043 Bidder Information and Signature / Addenda Acknowledgement
Page 1044 Information for Bidders
Page 1046 Bidder's Check List
Page 1047 Statement of Bidder's Qualifications
Page 1048 References
Page 1049 Non-Collusion Affidavit
Page 1050 Surplus Material Disposal And/Or Removal
Page 1051 Subcontractor List
Page 1052 Recycled Materials Reporting
Page 1053 Certification of Compliance with Wage Payment Statutes
Page 1054 Draft Contract Documents
Page 1055 City of Woodinville Public Works Contract
Page 1057 Apprentice Utilization Plan
Page 1058 Apprentice Utilization Good Faith Efforts Documentation
Page 1060 Public Works Performance and Payment Bond
Page 1062 Contractor's Declaration of Option for Management of Statutory Retained Percentage
Page 1063 Public Works Project - Retained Percentage Escrow Agreement
Page 1066 USDOT Standard Title VI / Nondiscrimination Assurances for Contractors
Page 1070 Retainage Release Requirements