2026 WWTP Outfall Bank Stabilization, Town of South Prairie, WA
$215,000 to $300,000
Plans
Specs
Register on this project.
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
Town of South Prairie
121 Washington St
South Prairie, WA 98385
Issued by:
www.bxwa.com
Engineer:
BHC Consultants, LLC
1601 Fifth Avenue, Suite 500
Seattle, WA 98101
206-505-3400
Fax: 206-505-3406
Contact: Darton Riely-Gibbons
206-357-9979
dgibbons@bhcconsultants.com
Prebid: 4/22 @ 1:00 pm at the Project site, northeast of the intersection of Emery Avenue and Franklin Street, South Prairie, WA 98385
Description:
Principal items of Work included in the 2026 WWTP Outfall Bank Stabilization Project are:
• Installation of a rock filled trench that is approximately 113 LF long by 7 feet wide by 12 feet deep.
• Installation of geotextile fabric.
• Installation of crushed surfacing top course.
• Installation of amended topsoil and grass seeding.
• Removal and replacement of an existing vehicle guard rail.
• Removal of existing vegetation.
• Relocation of existing utility pole (by others).
• Removal and replacement of existing landscape features (boulders).