This document has 545 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.
Page 1 Cover Page
Page 2 Notice of Call for Bids
Page 6 Vicinity Map
Page 7 Summary of Quantities
Page 12 Introduction / Special Provisions / Project Proposal
Page 14 Contents
Page 23 Introduction / Special Provisions
Page 24 Introduction to the Special Provisions / Division 1 General Requirements
Page 92 Division 2 Earthwork
Page 100 Division 3 Aggregate Production & Acceptance
Page 102 Division 5 Surface Treatments & Pavements
Page 115 Division 6 Structures
Page 129 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 149 Division 8 Miscellaneous Construction
Page 177 Division 9 Materials
Page 195 Prevailing Wage Information
Page 197 Benefit Code Key
Page 215 Supplemental to Wage Rates
Page 226 Washington State Prevailing Wage Rates - Snohomish County
Page 272 Federal Wage Rates
Page 321 Project Proposal
Page 370 Appendix A Geotechnical Memorandum
Page 416 Appendix B Permits
Page 421 Appendix C Monument Preservation Documentation
Page 423 Appendix D Stormwater Pollution Prevention Plan
Page 472 Appendix E Inadvertent Discovery Plan
Page 486 Appendix F Alderwood Water & Wastewater District Standards & Specifications
Page 544 Appendix G Invasive Species Memo
|